Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Sand cushion throwing and filling construction system and sand cushion throwing and filling construction method
The invention relates to a sand cushion throwing and filling construction system and a sand cushion throwing and filling construction method. The sand cushion throwing and filling construction system comprises a positioning frame, a positioning barge used for positioning the positioning frame, a slinging ship used for slinging and a water depth measurer used for measuring the water depth, and the positioning frame is provided with a plurality of fine throwing subareas. According to the system, the sand cushion throwing and filling area is strictly subdivided through the positioning frame, the throwing and filling time of the sand throwing ship in each fine throwing and filling area is controlled, accurate control over the sand cushion throwing and filling thickness and uniformity is achieved, the throwing and filling precision is improved, the throwing and filling thickness deviation is reduced, and the construction cost is reduced.
本发明涉及一种砂垫层抛填施工系统和砂垫层抛填施工方法,包括定位框架、用于定位框架定位的定位驳船、用于抛砂的抛砂船、及用于测量水深的水深测量器,定位框架设有多个精抛分区。该系统通过定位框架严格细分砂垫层抛填区域,控制抛砂船在各精抛分区的抛填时间,实现对砂垫层抛填厚度及均匀度的准确控制,提高抛填精度,减少抛填厚度偏差,降低施工成本。
Sand cushion throwing and filling construction system and sand cushion throwing and filling construction method
The invention relates to a sand cushion throwing and filling construction system and a sand cushion throwing and filling construction method. The sand cushion throwing and filling construction system comprises a positioning frame, a positioning barge used for positioning the positioning frame, a slinging ship used for slinging and a water depth measurer used for measuring the water depth, and the positioning frame is provided with a plurality of fine throwing subareas. According to the system, the sand cushion throwing and filling area is strictly subdivided through the positioning frame, the throwing and filling time of the sand throwing ship in each fine throwing and filling area is controlled, accurate control over the sand cushion throwing and filling thickness and uniformity is achieved, the throwing and filling precision is improved, the throwing and filling thickness deviation is reduced, and the construction cost is reduced.
本发明涉及一种砂垫层抛填施工系统和砂垫层抛填施工方法,包括定位框架、用于定位框架定位的定位驳船、用于抛砂的抛砂船、及用于测量水深的水深测量器,定位框架设有多个精抛分区。该系统通过定位框架严格细分砂垫层抛填区域,控制抛砂船在各精抛分区的抛填时间,实现对砂垫层抛填厚度及均匀度的准确控制,提高抛填精度,减少抛填厚度偏差,降低施工成本。
Sand cushion throwing and filling construction system and sand cushion throwing and filling construction method
砂垫层抛填施工系统和砂垫层抛填施工方法
LI XIANG (Autor:in) / YU YANAN (Autor:in) / ZHU DING (Autor:in) / TANG WEI (Autor:in) / HUANG SHUANGFEI (Autor:in) / LI SHUTANG (Autor:in)
10.10.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Sand throwing device for improving sand throwing precision
Europäisches Patentamt | 2024
|Airtight earthwork throwing and filling construction process
Europäisches Patentamt | 2021
|Geotechnical cloth sand bag rapid throwing and filling system and method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|