Installation and construction method for sewage discharge pipeline
The invention relates to the technical field of sewage discharge pipe installation, in particular to a sewage discharge pipe installation construction method. Comprising four bases, every two bases form a group, the two groups of bases are in bilateral symmetry, the two bases in each group are in front-back symmetry, rolling shafts are installed on the upper end faces of the bases, abutting blocks are installed at the lower ends of the bases in a sliding mode, and the abutting blocks are of a right trapezoid structure. A push-pull mechanism used for pulling the blow-off pipe to be in butt joint is arranged between the bases, and a lifting mechanism used for driving the abutting block is arranged between the two bases located on the left side. The problems that in the connecting process of existing blow-off pipes, corrugated pipes are pulled only through chains, the corrugated pipes abut against the ground, pollution is caused, the sealing performance of the connecting positions of the corrugated pipes is affected, the operation of fixing the corrugated pipes through the chains is tedious, and the butt joint efficiency between the corrugated pipes is affected are solved.
本发明涉及排污管安装技术领域,特别涉及一种污水排污管道安装施工方法;包括底座,所述底座的数目为四,每两个底座为一组,两组底座呈左右对称,且每组的两个底座呈前后对称,底座的上端面安装有滚轴,底座的下端滑动安装有抵触块,抵触块为直角梯形结构,底座之间共同设置有用于拉动排污管对接的推拉机构,位于左侧的两个底座之间设置有用于驱动抵触块的抬起机构;本发明解决了目前的排污管在进行连接的过程中主要存在的仅通过锁链拉动波纹管,波纹管与地面抵触污染,影响波纹管连接处的密封性,以及锁链固定波纹管操作繁琐,影响波纹管之间的对接效率等问题。
Installation and construction method for sewage discharge pipeline
The invention relates to the technical field of sewage discharge pipe installation, in particular to a sewage discharge pipe installation construction method. Comprising four bases, every two bases form a group, the two groups of bases are in bilateral symmetry, the two bases in each group are in front-back symmetry, rolling shafts are installed on the upper end faces of the bases, abutting blocks are installed at the lower ends of the bases in a sliding mode, and the abutting blocks are of a right trapezoid structure. A push-pull mechanism used for pulling the blow-off pipe to be in butt joint is arranged between the bases, and a lifting mechanism used for driving the abutting block is arranged between the two bases located on the left side. The problems that in the connecting process of existing blow-off pipes, corrugated pipes are pulled only through chains, the corrugated pipes abut against the ground, pollution is caused, the sealing performance of the connecting positions of the corrugated pipes is affected, the operation of fixing the corrugated pipes through the chains is tedious, and the butt joint efficiency between the corrugated pipes is affected are solved.
本发明涉及排污管安装技术领域,特别涉及一种污水排污管道安装施工方法;包括底座,所述底座的数目为四,每两个底座为一组,两组底座呈左右对称,且每组的两个底座呈前后对称,底座的上端面安装有滚轴,底座的下端滑动安装有抵触块,抵触块为直角梯形结构,底座之间共同设置有用于拉动排污管对接的推拉机构,位于左侧的两个底座之间设置有用于驱动抵触块的抬起机构;本发明解决了目前的排污管在进行连接的过程中主要存在的仅通过锁链拉动波纹管,波纹管与地面抵触污染,影响波纹管连接处的密封性,以及锁链固定波纹管操作繁琐,影响波纹管之间的对接效率等问题。
Installation and construction method for sewage discharge pipeline
一种污水排污管道安装施工方法
YAN YANG (Autor:in) / DUN RUI (Autor:in) / ZHENG SHENJUN (Autor:in)
10.10.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E03F
SEWERS
,
Abwasserkanäle
Sewage inspection well and pipeline construction device and installation method
Europäisches Patentamt | 2024
|Sewage filtering device for sewage discharge pipeline
Europäisches Patentamt | 2020
|