Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Connecting structure for upper-layer wall body and lower-layer wall body of fabricated shear wall and construction method
The invention relates to the field of shear wall construction technologies, in particular to a fabricated shear wall upper-layer wall body and lower-layer wall body connecting structure and a construction method. Comprising an upper-layer prefabricated wall body, a lower-layer prefabricated wall body, an upper-layer extending key type plate, a lower-layer extending key type plate and a stabilizing assembly. The upper-layer extending key type plate is arranged on one side of the upper-layer prefabricated wall body; a grouting opening is formed in the upper-layer prefabricated wall body; the lower-layer extending key type plate is arranged on the lower-layer prefabricated wall body; the stabilizing assembly is arranged in the connecting space and used for connecting the upper-layer prefabricated wall body with the lower-layer prefabricated wall body; slurry enters the first space and the second space through the grouting opening, the connecting space is filled with the slurry, the purpose of fixedly connecting the upper-layer prefabricated wall body and the lower-layer prefabricated wall body is achieved after the slurry is solidified, meanwhile, a sleeve is not needed when the upper-layer prefabricated wall body and the lower-layer prefabricated wall body are connected, the construction cost of the shear wall is reduced, and on the one hand, the construction efficiency is improved. And the construction efficiency of the shear wall is improved.
本发明涉及剪力墙施工技术的领域,尤其是涉及一种装配式剪力墙上下层墙体连接结构及施工方法;包括上层预制墙体、下层预制墙体、上层伸出键式板、下层伸出键式板以及稳固组件;上层伸出键式板设于上层预制墙体的一侧;所述上层预制墙体上设有注浆口;下层伸出键式板设于下层预制墙体上;稳固组件设于连接空间内,用于将上层预制墙体与下层预制墙体连接;浆料经过注浆口进入第一空间、第二空间内,浆料在连接空间内充满,待浆料凝固后实现将上层预制墙体与下层预制墙体连接固定的目的,同时上层预制墙体与下层预制墙体连接时不需要使用套管,降低了剪力墙的施工成本,另一方面,提高对剪力墙的施工效率。
Connecting structure for upper-layer wall body and lower-layer wall body of fabricated shear wall and construction method
The invention relates to the field of shear wall construction technologies, in particular to a fabricated shear wall upper-layer wall body and lower-layer wall body connecting structure and a construction method. Comprising an upper-layer prefabricated wall body, a lower-layer prefabricated wall body, an upper-layer extending key type plate, a lower-layer extending key type plate and a stabilizing assembly. The upper-layer extending key type plate is arranged on one side of the upper-layer prefabricated wall body; a grouting opening is formed in the upper-layer prefabricated wall body; the lower-layer extending key type plate is arranged on the lower-layer prefabricated wall body; the stabilizing assembly is arranged in the connecting space and used for connecting the upper-layer prefabricated wall body with the lower-layer prefabricated wall body; slurry enters the first space and the second space through the grouting opening, the connecting space is filled with the slurry, the purpose of fixedly connecting the upper-layer prefabricated wall body and the lower-layer prefabricated wall body is achieved after the slurry is solidified, meanwhile, a sleeve is not needed when the upper-layer prefabricated wall body and the lower-layer prefabricated wall body are connected, the construction cost of the shear wall is reduced, and on the one hand, the construction efficiency is improved. And the construction efficiency of the shear wall is improved.
本发明涉及剪力墙施工技术的领域,尤其是涉及一种装配式剪力墙上下层墙体连接结构及施工方法;包括上层预制墙体、下层预制墙体、上层伸出键式板、下层伸出键式板以及稳固组件;上层伸出键式板设于上层预制墙体的一侧;所述上层预制墙体上设有注浆口;下层伸出键式板设于下层预制墙体上;稳固组件设于连接空间内,用于将上层预制墙体与下层预制墙体连接;浆料经过注浆口进入第一空间、第二空间内,浆料在连接空间内充满,待浆料凝固后实现将上层预制墙体与下层预制墙体连接固定的目的,同时上层预制墙体与下层预制墙体连接时不需要使用套管,降低了剪力墙的施工成本,另一方面,提高对剪力墙的施工效率。
Connecting structure for upper-layer wall body and lower-layer wall body of fabricated shear wall and construction method
一种装配式剪力墙上下层墙体连接结构及施工方法
ZHENG WEI (Autor:in) / PAN ZUANFENG (Autor:in) / YIN GUANGHUA (Autor:in) / CHEN SHAOJUN (Autor:in) / LI JINFEI (Autor:in)
13.10.2023
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|Wall body connecting piece, fabricated wall body joint and fabricated wall body
Europäisches Patentamt | 2022
|Fabricated superimposed shear wall structure wall body and construction method
Europäisches Patentamt | 2024
|Fabricated shear wall connecting mechanism, shear wall and shear wall construction method
Europäisches Patentamt | 2021
|Fabricated shear wall connecting mechanism, shear wall and shear wall construction method
Europäisches Patentamt | 2021
|