Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method for reinforcing super-large-section stiff steel reinforced beam at large cantilever part
The invention discloses a method for reinforcing a super-large-section stiff steel reinforced beam at a large cantilever part. The method comprises the following steps: mounting a stiff steel beam; a beam bottom handling frame system is built, and preliminary stabilizing treatment is conducted on the stiff steel beams installed in the step A; a fixed suspended formwork system is arranged, and the beam bottom operation system in the step B is loosened; and reinforcement treatment and concrete pouring are carried out according to the arranged suspended formwork system, and formwork removal treatment is carried out. By improving the mounting and fixing mode of the stiff steel reinforced beam, reinforcement of the super-large-section stiff steel reinforced beam is enhanced.
本发明公开了一种大悬挑部位超大截面劲性钢骨梁加固办法,包括以下步骤:安装劲性钢梁;建立梁底操作架体系,针对A步骤安装好的劲性钢梁进行初步稳固处理;设置固定吊模体系,并对B步骤中的梁底操作体系进行松脱;根据所设置的吊模体系进行加固处理并浇筑混凝土,并进行拆模处理。本发明通过改良劲性钢骨梁的安装和固定方式,加强对超大截面劲性钢骨梁的加固。
Method for reinforcing super-large-section stiff steel reinforced beam at large cantilever part
The invention discloses a method for reinforcing a super-large-section stiff steel reinforced beam at a large cantilever part. The method comprises the following steps: mounting a stiff steel beam; a beam bottom handling frame system is built, and preliminary stabilizing treatment is conducted on the stiff steel beams installed in the step A; a fixed suspended formwork system is arranged, and the beam bottom operation system in the step B is loosened; and reinforcement treatment and concrete pouring are carried out according to the arranged suspended formwork system, and formwork removal treatment is carried out. By improving the mounting and fixing mode of the stiff steel reinforced beam, reinforcement of the super-large-section stiff steel reinforced beam is enhanced.
本发明公开了一种大悬挑部位超大截面劲性钢骨梁加固办法,包括以下步骤:安装劲性钢梁;建立梁底操作架体系,针对A步骤安装好的劲性钢梁进行初步稳固处理;设置固定吊模体系,并对B步骤中的梁底操作体系进行松脱;根据所设置的吊模体系进行加固处理并浇筑混凝土,并进行拆模处理。本发明通过改良劲性钢骨梁的安装和固定方式,加强对超大截面劲性钢骨梁的加固。
Method for reinforcing super-large-section stiff steel reinforced beam at large cantilever part
一种大悬挑部位超大截面劲性钢骨梁加固办法
ZENG BING (Autor:in) / FU LEI (Autor:in) / LI HUI (Autor:in) / FENG YIPEI (Autor:in) / LU LIANG (Autor:in) / LU JUNJUN (Autor:in) / LIN DONGXIONG (Autor:in) / YANG DAN (Autor:in) / BI QINGBIN (Autor:in) / BAI JIAHAO (Autor:in)
13.10.2023
Patent
Elektronische Ressource
Chinesisch
Large-section stiff steel beam reverse construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Reinforcing construction method for super-high-rise super-large-section steel concrete column
Europäisches Patentamt | 2024
|Large-span stiff steel reinforced concrete beam connecting structure and construction method
Europäisches Patentamt | 2024
|Construction method of large-cantilever inclined stiff concrete cylinder
Europäisches Patentamt | 2024
|