Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Structure and installation method of double-layer keel suspended ceiling convenient to disassemble
The invention relates to the technical field of suspended ceilings, in particular to a structure of a double-layer keel suspended ceiling convenient to disassemble and a mounting method. The structure comprises an aluminum honeycomb panel and an installation assembly used for installing the aluminum honeycomb panel to a top wall keel, the installation assembly comprises a hanging piece, the aluminum honeycomb panel comprises an installation groove, and the installation assembly further comprises an edge embedding sectional material partially arranged in the installation groove. Each edge-embedded profile comprises a three-ring plate connected with the three faces of the corresponding mounting groove and a folding device connected with the three-ring plate, each folding device comprises a clamping plate and an abutting plate used for connecting the clamping plate with the three-ring plate, and the surfaces of the abutting plates of every two adjacent edge-embedded profiles are connected. By means of the abutting effect of the abutting plates of every two adjacent embedded edge profiles, the installation step that in the prior art, gaps between every two adjacent aluminum honeycomb panels need to be filled independently can be effectively omitted, connection between the aluminum honeycomb panels is stable, the whole connecting interface is attractive, and the requirement for quick assembly and quick disassembly of assembly type decoration is met.
本发明涉及吊顶技术领域,具体属于一种便于拆卸的双层龙骨吊顶的结构及安装方法。所述结构包括铝蜂窝板以及用于将所述铝蜂窝板安装至顶墙龙骨的安装组件,所述安装组件包括吊挂件,所述铝蜂窝板包括安装槽,所述安装组件还包括部分内置于安装槽内部的嵌边型材,所述嵌边型材包括与安装槽三面相接的三环板以及与三环板相接的折接装置,所述折接装置包括卡接板,以及用于连接卡接板和三环板的抵接板,相邻两嵌边型材的抵接板的表面相接。本发明利用相邻两嵌边型材的抵接板的抵接作用,可以有效的节省现有技术中需要单独对相邻铝蜂窝板之间的缝隙进行填缝的安装步骤,且铝蜂窝板之间连接稳定,连接界面整体美观,满足装配式装修快装快拆的要求。
Structure and installation method of double-layer keel suspended ceiling convenient to disassemble
The invention relates to the technical field of suspended ceilings, in particular to a structure of a double-layer keel suspended ceiling convenient to disassemble and a mounting method. The structure comprises an aluminum honeycomb panel and an installation assembly used for installing the aluminum honeycomb panel to a top wall keel, the installation assembly comprises a hanging piece, the aluminum honeycomb panel comprises an installation groove, and the installation assembly further comprises an edge embedding sectional material partially arranged in the installation groove. Each edge-embedded profile comprises a three-ring plate connected with the three faces of the corresponding mounting groove and a folding device connected with the three-ring plate, each folding device comprises a clamping plate and an abutting plate used for connecting the clamping plate with the three-ring plate, and the surfaces of the abutting plates of every two adjacent edge-embedded profiles are connected. By means of the abutting effect of the abutting plates of every two adjacent embedded edge profiles, the installation step that in the prior art, gaps between every two adjacent aluminum honeycomb panels need to be filled independently can be effectively omitted, connection between the aluminum honeycomb panels is stable, the whole connecting interface is attractive, and the requirement for quick assembly and quick disassembly of assembly type decoration is met.
本发明涉及吊顶技术领域,具体属于一种便于拆卸的双层龙骨吊顶的结构及安装方法。所述结构包括铝蜂窝板以及用于将所述铝蜂窝板安装至顶墙龙骨的安装组件,所述安装组件包括吊挂件,所述铝蜂窝板包括安装槽,所述安装组件还包括部分内置于安装槽内部的嵌边型材,所述嵌边型材包括与安装槽三面相接的三环板以及与三环板相接的折接装置,所述折接装置包括卡接板,以及用于连接卡接板和三环板的抵接板,相邻两嵌边型材的抵接板的表面相接。本发明利用相邻两嵌边型材的抵接板的抵接作用,可以有效的节省现有技术中需要单独对相邻铝蜂窝板之间的缝隙进行填缝的安装步骤,且铝蜂窝板之间连接稳定,连接界面整体美观,满足装配式装修快装快拆的要求。
Structure and installation method of double-layer keel suspended ceiling convenient to disassemble
一种便于拆卸的双层龙骨吊顶的结构及安装方法
DING XINXIN (Autor:in) / WANG WENGUANG (Autor:in) / ZHOU DONGSHAN (Autor:in) / REN JIE (Autor:in) / LI PENGCHENG (Autor:in) / PENG WEI (Autor:in) / CAI SHUAISHUAI (Autor:in) / LIN XIANYANG (Autor:in) / WANG CHENCHENG (Autor:in) / ZHANG YAMEI (Autor:in)
17.10.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Suspended ceiling convenient to disassemble and assemble
Europäisches Patentamt | 2021
|Aluminum gusset plate suspended ceiling structure convenient to disassemble
Europäisches Patentamt | 2023
|