Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fully-prefabricated steel-concrete composite column
A fully-prefabricated steel-concrete composite column is formed by combining a prefabricated column top steel-concrete column, a prefabricated middle steel-concrete column and a prefabricated column bottom steel-concrete column, the two ends of the column bottom steel-concrete column, the two ends of the middle steel-concrete column and the two ends of the column top steel-concrete column and the positions where the column bottom steel-concrete column, the middle steel-concrete column and the column top steel-concrete column are connected with a steel beam are all provided with steel structure external members, and other parts are of concrete structures. The column bottom steel-concrete column, the middle steel-concrete columns and the column top steel-concrete column are sequentially connected in an end-to-end welding mode, the column bottom steel-concrete column is connected with a ground foundation, and the multiple middle steel-concrete columns are arranged according to the floor height. And only the two ends and the positions connected with the steel beams adopt the steel structure suites, other parts are concrete structures, the steel consumption is reduced, and the cost is low.
一种全预制钢混组合柱,由预制的柱顶钢混柱、中部钢混柱和柱底钢混柱组合而成,柱底钢混柱、中部钢混柱和柱顶钢混柱的两端以及与钢梁连接的位置均采用钢结构套件、其它部分为混凝土结构,柱底钢混柱、中部钢混柱和柱顶钢混柱依次首尾焊接连接,所述柱底钢混柱与地面基础连接,中部钢混柱根据楼层高度布设多根,本装置为全预制,现场只需焊接连接即可,装配程度高,施工速度快,而且只有两端以及与钢梁连接的位置均采用钢结构套件、其它部分为混凝土结构用钢量省,成本较低。
Fully-prefabricated steel-concrete composite column
A fully-prefabricated steel-concrete composite column is formed by combining a prefabricated column top steel-concrete column, a prefabricated middle steel-concrete column and a prefabricated column bottom steel-concrete column, the two ends of the column bottom steel-concrete column, the two ends of the middle steel-concrete column and the two ends of the column top steel-concrete column and the positions where the column bottom steel-concrete column, the middle steel-concrete column and the column top steel-concrete column are connected with a steel beam are all provided with steel structure external members, and other parts are of concrete structures. The column bottom steel-concrete column, the middle steel-concrete columns and the column top steel-concrete column are sequentially connected in an end-to-end welding mode, the column bottom steel-concrete column is connected with a ground foundation, and the multiple middle steel-concrete columns are arranged according to the floor height. And only the two ends and the positions connected with the steel beams adopt the steel structure suites, other parts are concrete structures, the steel consumption is reduced, and the cost is low.
一种全预制钢混组合柱,由预制的柱顶钢混柱、中部钢混柱和柱底钢混柱组合而成,柱底钢混柱、中部钢混柱和柱顶钢混柱的两端以及与钢梁连接的位置均采用钢结构套件、其它部分为混凝土结构,柱底钢混柱、中部钢混柱和柱顶钢混柱依次首尾焊接连接,所述柱底钢混柱与地面基础连接,中部钢混柱根据楼层高度布设多根,本装置为全预制,现场只需焊接连接即可,装配程度高,施工速度快,而且只有两端以及与钢梁连接的位置均采用钢结构套件、其它部分为混凝土结构用钢量省,成本较低。
Fully-prefabricated steel-concrete composite column
一种全预制钢混组合柱
17.10.2023
Patent
Elektronische Ressource
Chinesisch
Prefabricated steel reinforced concrete column and composite structure
Europäisches Patentamt | 2023
|Prefabricated steel assembly for steel composite concrete column with permanent concrete form
Europäisches Patentamt | 2021
Prefabricated steel assembly for steel composite concrete column with permanent concrete form
Europäisches Patentamt | 2021
|PREFABRICATED PIER COLUMN MEMBER WITH STEEL-CONCRETE COMPOSITE STRUCTURE
Europäisches Patentamt | 2019
PREFABRICATED PIER COLUMN MEMBER WITH STEEL-CONCRETE COMPOSITE STRUCTURE
Europäisches Patentamt | 2017
|