Installation and construction method for integral light steel keel suspended ceiling
The invention discloses an integral light steel keel suspended ceiling installation and construction method, and belongs to the technical field of suspended ceiling construction. Based on the design of the construction structure, the method that ceiling installation construction is conducted on the ground in advance, and then the ceiling is integrally hoisted and lifted to the design height is adopted, and the construction efficiency is improved on the basis that the overall ceiling construction quality can be guaranteed. The construction difficulty is greatly reduced, the construction period is shortened, the cost of people, materials and machines for secondary erection and disassembly of the operation frame is saved, and the problems of potential safety hazards and the like caused by erection and disassembly of the frame body and installation of the suspended ceiling on the frame body are solved.
一种整体式轻钢龙骨吊顶安装施工方法,属于吊顶施工技术领域。本发明基于其施工结构的设计,采用在地面上先行进行吊顶安装施工,然后将吊顶进行整体吊装提升至设计高度的方法,能够保证吊顶施工整体质量的基础上,大大降低施工难度、缩短施工周期、节省作业架二次搭设、拆除的人材机等费用、避免架体搭设、拆除及在架体上安装吊顶存在的安全隐患等问题。
Installation and construction method for integral light steel keel suspended ceiling
The invention discloses an integral light steel keel suspended ceiling installation and construction method, and belongs to the technical field of suspended ceiling construction. Based on the design of the construction structure, the method that ceiling installation construction is conducted on the ground in advance, and then the ceiling is integrally hoisted and lifted to the design height is adopted, and the construction efficiency is improved on the basis that the overall ceiling construction quality can be guaranteed. The construction difficulty is greatly reduced, the construction period is shortened, the cost of people, materials and machines for secondary erection and disassembly of the operation frame is saved, and the problems of potential safety hazards and the like caused by erection and disassembly of the frame body and installation of the suspended ceiling on the frame body are solved.
一种整体式轻钢龙骨吊顶安装施工方法,属于吊顶施工技术领域。本发明基于其施工结构的设计,采用在地面上先行进行吊顶安装施工,然后将吊顶进行整体吊装提升至设计高度的方法,能够保证吊顶施工整体质量的基础上,大大降低施工难度、缩短施工周期、节省作业架二次搭设、拆除的人材机等费用、避免架体搭设、拆除及在架体上安装吊顶存在的安全隐患等问题。
Installation and construction method for integral light steel keel suspended ceiling
一种整体式轻钢龙骨吊顶安装施工方法
JIN ZUHONG (Autor:in) / SI YIPING (Autor:in) / YU TAO (Autor:in) / LIU SHUNFEI (Autor:in) / HUANG SHENGRONG (Autor:in) / ZHANG FENGYI (Autor:in) / HUANG JIAN (Autor:in) / SHI JUJIANG (Autor:in) / XU SEN (Autor:in) / HE HONGWEI (Autor:in)
20.10.2023
Patent
Elektronische Ressource
Chinesisch
Light steel keel gypsum board suspended ceiling construction process
Europäisches Patentamt | 2021
|Light steel keel suspended ceiling structure and construction method thereof