Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated aluminum alloy formwork system construction method
The invention provides a construction method of an assembly type aluminum alloy formwork system, and relates to the field of building construction. The construction method of the assembly type aluminum alloy formwork system comprises the steps that S1, a design stage is conducted, size measurement and line drawing are conducted on a construction area on a construction site, then a technician of a construction party confirms that the size is correct, and factory production is arranged after size data are correct; a layer of separant is smeared on the side wall of the aluminum alloy formwork before installation, the aluminum alloy formwork is effectively prevented from being adhered to concrete when the concrete is poured, the surface quality of the concrete is good after the aluminum alloy formwork is dismantled, meanwhile, a material conveying opening for conveying the formwork upwards is reserved when the formwork is designed, the formwork can be conveniently conveyed upwards manually, vertical conveying equipment does not need to be occupied, and the production efficiency is improved. And the overall speed during upper-layer assembly and installation is improved.
本发明提供一种装配式铝合金模板体系施工方法,涉及建筑施工领域。该装配式铝合金模板体系施工方法,包括S1.设计阶段,在施工现场对施工地区进行测量尺寸和画线处理,随后与施工方技术人员确认尺寸无误,尺寸数据无误后安排工厂生产。通过安装前在铝合金模板的侧壁上涂抹一层隔离剂,有效放置在浇筑混凝土时与混凝土产生粘连,拆除后混凝土表面质量好,同时在模板设计时留有供模板向上传送的传料口,方便模板通过人工往上倒运,无需占用垂直运输设备,提高上层装配安装时的整体速度。
Fabricated aluminum alloy formwork system construction method
The invention provides a construction method of an assembly type aluminum alloy formwork system, and relates to the field of building construction. The construction method of the assembly type aluminum alloy formwork system comprises the steps that S1, a design stage is conducted, size measurement and line drawing are conducted on a construction area on a construction site, then a technician of a construction party confirms that the size is correct, and factory production is arranged after size data are correct; a layer of separant is smeared on the side wall of the aluminum alloy formwork before installation, the aluminum alloy formwork is effectively prevented from being adhered to concrete when the concrete is poured, the surface quality of the concrete is good after the aluminum alloy formwork is dismantled, meanwhile, a material conveying opening for conveying the formwork upwards is reserved when the formwork is designed, the formwork can be conveniently conveyed upwards manually, vertical conveying equipment does not need to be occupied, and the production efficiency is improved. And the overall speed during upper-layer assembly and installation is improved.
本发明提供一种装配式铝合金模板体系施工方法,涉及建筑施工领域。该装配式铝合金模板体系施工方法,包括S1.设计阶段,在施工现场对施工地区进行测量尺寸和画线处理,随后与施工方技术人员确认尺寸无误,尺寸数据无误后安排工厂生产。通过安装前在铝合金模板的侧壁上涂抹一层隔离剂,有效放置在浇筑混凝土时与混凝土产生粘连,拆除后混凝土表面质量好,同时在模板设计时留有供模板向上传送的传料口,方便模板通过人工往上倒运,无需占用垂直运输设备,提高上层装配安装时的整体速度。
Fabricated aluminum alloy formwork system construction method
一种装配式铝合金模板体系施工方法
20.10.2023
Patent
Elektronische Ressource
Chinesisch
Fabricated building aluminum alloy formwork construction technology
Europäisches Patentamt | 2021
|Fabricated building aluminum alloy formwork construction technology
Europäisches Patentamt | 2023
|Aluminum alloy formwork construction method applied to fabricated engineering
Europäisches Patentamt | 2020
|