Installation method of tool for rapid construction of road base and subbase
The invention discloses an installation method of a tool for rapid construction of a road base layer and a subbase layer, which comprises the following steps of: S1, transporting multiple layers of side templates to a site through a rapid tool installation machine, and installing the multiple layers of side templates on the side edges of a subbase layer and a base layer working surface to be constructed according to a designed elevation and a designed side line; s2, supporting rods are arranged at intervals designed according to the construction scheme through a rapid tool installing machine, the supporting rods are fixed to the outer sides of the side face formworks through fasteners on the rapid tool installing machine, and subbase layer construction is conducted after the first layer of side face formwork is fixed; and S3, after construction of the sub-base layer is completed, construction of the first base layer and the second base layer is conducted according to the same steps. Construction is organized in a multi-layer continuous paving rapid construction mode, the intelligent construction technology can be used for replacing manual work in the construction links, the part capable of shortening the construction period and intelligently replacing manual work in the construction process is found, and innovation of the intelligent construction technology is achieved through the automation technology.
本发明公开了一种公路基层、底基层快速建造用工装的安装方法,包括以下步骤:S1、将多层侧面模板通过快速工装安装机运输至现场,按设计的标高及边线安装在拟建底基层、基层作业面的侧边;S2、用快速工装安装机按施工方案设计的间距布设支撑杆,通过快速工装安装机上的紧固器将支撑杆固定在侧面模板的外侧,完成第一层侧面模板固定后进行底基层施工;S3、底基层施工完成后,按照同样的步骤进行第一层基层及第二层基层的施工。本发明采取多层连铺快速施工的方式组织施工,洞悉其施工环节的可以利用智能建造技术取代人工的环节,寻找施工过程中可以进行工期缩短、智能替代人工的部分,通过自动化技术实现智能建造技术的创新。
Installation method of tool for rapid construction of road base and subbase
The invention discloses an installation method of a tool for rapid construction of a road base layer and a subbase layer, which comprises the following steps of: S1, transporting multiple layers of side templates to a site through a rapid tool installation machine, and installing the multiple layers of side templates on the side edges of a subbase layer and a base layer working surface to be constructed according to a designed elevation and a designed side line; s2, supporting rods are arranged at intervals designed according to the construction scheme through a rapid tool installing machine, the supporting rods are fixed to the outer sides of the side face formworks through fasteners on the rapid tool installing machine, and subbase layer construction is conducted after the first layer of side face formwork is fixed; and S3, after construction of the sub-base layer is completed, construction of the first base layer and the second base layer is conducted according to the same steps. Construction is organized in a multi-layer continuous paving rapid construction mode, the intelligent construction technology can be used for replacing manual work in the construction links, the part capable of shortening the construction period and intelligently replacing manual work in the construction process is found, and innovation of the intelligent construction technology is achieved through the automation technology.
本发明公开了一种公路基层、底基层快速建造用工装的安装方法,包括以下步骤:S1、将多层侧面模板通过快速工装安装机运输至现场,按设计的标高及边线安装在拟建底基层、基层作业面的侧边;S2、用快速工装安装机按施工方案设计的间距布设支撑杆,通过快速工装安装机上的紧固器将支撑杆固定在侧面模板的外侧,完成第一层侧面模板固定后进行底基层施工;S3、底基层施工完成后,按照同样的步骤进行第一层基层及第二层基层的施工。本发明采取多层连铺快速施工的方式组织施工,洞悉其施工环节的可以利用智能建造技术取代人工的环节,寻找施工过程中可以进行工期缩短、智能替代人工的部分,通过自动化技术实现智能建造技术的创新。
Installation method of tool for rapid construction of road base and subbase
一种公路基层、底基层快速建造用工装的安装方法
JIANG YONG (Autor:in)
24.10.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Subbase structure for preventing road base from cracking
Europäisches Patentamt | 2020
|Post-Construction Environmental Monitoring of a Fly Ash Based Road Subbase
British Library Conference Proceedings | 2005
|