Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Multi-stage desilting and impurity-removing sluice for water conservancy project
The invention relates to the technical field of water gate application, and provides a multistage dredging and impurity removing water gate for a water conservancy project, which comprises a fixed frame, a closed base arranged at the bottom of the fixed frame, and a plurality of closed plates longitudinally arranged in the fixed frame, a longitudinal moving assembly and a connection control assembly are arranged between the closing plate located on the uppermost side and the fixing frame, the connection control assembly is arranged between the multiple closing plates and used for controlling connection between the multiple closing plates, and the slope-shaped drainage plate is arranged in the fixing frame and used for guiding drainage of the slope-shaped drainage plate. And a position adjusting assembly is arranged between the slope-shaped drainage plate and the fixing frame, and through the technical scheme, the problem that in the prior art, garbage, impurities and sludge in water flow are difficult to clean is solved.
本发明涉及水闸应用技术领域,提出了一种水利工程用多级清淤除杂水闸,包括固定框架,封闭底座,封闭底座设置在固定框架的底部,封闭板,封闭板的数量为多个,且多个封闭板呈纵向设置在固定框架的内部,位于最上侧的封闭板和固定框架之间设置有纵向移动组件,连接控制组件,连接控制组件设置在多个封闭板之间,用于控制多个封闭板之间进行连接,坡型引流板,坡型引流板设置在固定框架的内部,坡型引流板和固定框架之间设置有位置调节组件,通过上述技术方案,解决了现有技术中水流中的垃圾、杂质和淤泥进行清理时较为困难的问题。
Multi-stage desilting and impurity-removing sluice for water conservancy project
The invention relates to the technical field of water gate application, and provides a multistage dredging and impurity removing water gate for a water conservancy project, which comprises a fixed frame, a closed base arranged at the bottom of the fixed frame, and a plurality of closed plates longitudinally arranged in the fixed frame, a longitudinal moving assembly and a connection control assembly are arranged between the closing plate located on the uppermost side and the fixing frame, the connection control assembly is arranged between the multiple closing plates and used for controlling connection between the multiple closing plates, and the slope-shaped drainage plate is arranged in the fixing frame and used for guiding drainage of the slope-shaped drainage plate. And a position adjusting assembly is arranged between the slope-shaped drainage plate and the fixing frame, and through the technical scheme, the problem that in the prior art, garbage, impurities and sludge in water flow are difficult to clean is solved.
本发明涉及水闸应用技术领域,提出了一种水利工程用多级清淤除杂水闸,包括固定框架,封闭底座,封闭底座设置在固定框架的底部,封闭板,封闭板的数量为多个,且多个封闭板呈纵向设置在固定框架的内部,位于最上侧的封闭板和固定框架之间设置有纵向移动组件,连接控制组件,连接控制组件设置在多个封闭板之间,用于控制多个封闭板之间进行连接,坡型引流板,坡型引流板设置在固定框架的内部,坡型引流板和固定框架之间设置有位置调节组件,通过上述技术方案,解决了现有技术中水流中的垃圾、杂质和淤泥进行清理时较为困难的问题。
Multi-stage desilting and impurity-removing sluice for water conservancy project
一种水利工程用多级清淤除杂水闸
GUO XIAOLIANG (Autor:in) / HAN JIAQI (Autor:in) / FENG YAZHU (Autor:in)
24.10.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Desilting device for water conservancy culvert and sluice
Europäisches Patentamt | 2024
|Desilting device for water conservancy culvert and sluice
Europäisches Patentamt | 2022
|Desilting device for water conservancy culvert and sluice
Europäisches Patentamt | 2024
|