Combined coping purline for abutment, outer wall abutment and construction method of outer wall abutment
According to the coping purline for the combined abutment, the outer wall abutment and the construction method of the coping purline, the coping purline is subjected to surface punching and grouting hole forming on the basis of the problems that an existing outer wall abutment is slow in construction progress, ring beams deviate and the building sealing performance is poor, and therefore the construction step of firstly assembling and then grouting can be achieved through the abutment; the steps are rationalized, and the construction period is shortened; meanwhile, in the pouring process of the coping beam, the template can be supported by means of the purline, and the coping straightness is guaranteed. In the coping grouting process, the interior of the coping purline is filled with slurry, the coping purline and the coping beam are poured into a whole with the help of the punching bending metal plate on the side wall of the hole as a stud, the air tightness, the water tightness and the stress strength of the coping are guaranteed, and on the premise that the stress strength is guaranteed, the thickness of the coping purline can be further reduced, and the cost is reduced.
本发明提出一种组合式台度用压顶檩条、外墙台度及其建造方法,本发明基于现有的外墙台度存在施工进度慢、圈梁跑偏以及建筑密封性差的问题,对压顶檩条进行表面冲孔,形成灌浆孔,从而使得台度可以实现先装配后灌浆的施工步骤,将步骤合理化,缩短工期;同时在压顶梁灌注过程中可以借助檩条支撑模板,保证压顶的直线度。在压顶灌浆过程中,浆料填充压顶檩条内部,借助孔洞侧壁的冲弯钣金作为栓钉,将压顶檩条和压顶梁灌注成一个整体,保证了压顶的气密性、水密性和受力强度,在保证了受力强度的前提下,进一步的可以减少压顶檩条的厚度,降低成本。
Combined coping purline for abutment, outer wall abutment and construction method of outer wall abutment
According to the coping purline for the combined abutment, the outer wall abutment and the construction method of the coping purline, the coping purline is subjected to surface punching and grouting hole forming on the basis of the problems that an existing outer wall abutment is slow in construction progress, ring beams deviate and the building sealing performance is poor, and therefore the construction step of firstly assembling and then grouting can be achieved through the abutment; the steps are rationalized, and the construction period is shortened; meanwhile, in the pouring process of the coping beam, the template can be supported by means of the purline, and the coping straightness is guaranteed. In the coping grouting process, the interior of the coping purline is filled with slurry, the coping purline and the coping beam are poured into a whole with the help of the punching bending metal plate on the side wall of the hole as a stud, the air tightness, the water tightness and the stress strength of the coping are guaranteed, and on the premise that the stress strength is guaranteed, the thickness of the coping purline can be further reduced, and the cost is reduced.
本发明提出一种组合式台度用压顶檩条、外墙台度及其建造方法,本发明基于现有的外墙台度存在施工进度慢、圈梁跑偏以及建筑密封性差的问题,对压顶檩条进行表面冲孔,形成灌浆孔,从而使得台度可以实现先装配后灌浆的施工步骤,将步骤合理化,缩短工期;同时在压顶梁灌注过程中可以借助檩条支撑模板,保证压顶的直线度。在压顶灌浆过程中,浆料填充压顶檩条内部,借助孔洞侧壁的冲弯钣金作为栓钉,将压顶檩条和压顶梁灌注成一个整体,保证了压顶的气密性、水密性和受力强度,在保证了受力强度的前提下,进一步的可以减少压顶檩条的厚度,降低成本。
Combined coping purline for abutment, outer wall abutment and construction method of outer wall abutment
一种组合式台度用压顶檩条、外墙台度及其建造方法
CHEN MING (Autor:in) / WU SHUANGSHUANG (Autor:in)
24.10.2023
Patent
Elektronische Ressource
Chinesisch
Bridge construction method using old bridge abutment foundation as abutment front retaining wall
Europäisches Patentamt | 2023
|Bridge abutment and bridge abutment design and construction method
Europäisches Patentamt | 2021
|Novel bridge abutment structure and construction technology of bridge abutment
Europäisches Patentamt | 2023
|Rib plate type retaining wall abutment and construction method
Europäisches Patentamt | 2021
|