Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Passive ultralow-energy-consumption green building outer wall pipe penetrating structure and construction method
The passive ultra-low-energy-consumption green building outer wall pipe penetrating structure solves the problems that existing rear pipe penetrating waterproof heat preservation sealing construction is poor in waterproof and heat preservation sealing quality, and existing equipment cannot complete waterproof heat preservation sealing by filling glue between double-layer sleeves during wall construction. Comprising a pre-buried sleeve, a formwork and a glue injection device, a water stop ring and a connecting structure are installed on the outer side of the pre-buried sleeve, a glue injection opening is formed in the pre-buried sleeve, a through-wall pipe is arranged in the pre-buried sleeve in a penetrating and penetrating mode, a filling cavity is formed between the through-wall pipe and the pre-buried sleeve, and the filling cavity communicates with the glue injection opening; the formwork is fixedly installed through a connecting disc, a screw and an embedded sleeve, the glue injection device comprises a glue injection barrel, a glue injection head is installed at the bottom of the glue injection barrel, and a hooking piece is installed on the glue injection barrel. Meanwhile, the invention further discloses a construction method of the outer wall through-wall structure.
本发明解决现有后穿管防水保温密封施工存在防水,保温密封质量差的难题和现有设备无法在墙体施工时一同完成双层套管间填胶完成防水保温密封的难题,具体方案如下:一种被动式超低能耗绿色建筑外墙穿管结构,包括预埋套管、模板和注胶装置,预埋套管的外侧安装有止水环和连接结构,预埋套管上开设有注胶口,预埋套管的内部穿插布设有穿墙管,穿墙管和预埋套管之间布设有填充腔,填充腔和注胶口互通,模板通过连接盘、螺钉和预埋套管固定安装,注胶装置包括注胶桶,注胶桶的底部安装有注胶头,注胶桶上安装有钩挂件。同时还公开外墙穿墙结构的施工方法彻底解决上述难题。
Passive ultralow-energy-consumption green building outer wall pipe penetrating structure and construction method
The passive ultra-low-energy-consumption green building outer wall pipe penetrating structure solves the problems that existing rear pipe penetrating waterproof heat preservation sealing construction is poor in waterproof and heat preservation sealing quality, and existing equipment cannot complete waterproof heat preservation sealing by filling glue between double-layer sleeves during wall construction. Comprising a pre-buried sleeve, a formwork and a glue injection device, a water stop ring and a connecting structure are installed on the outer side of the pre-buried sleeve, a glue injection opening is formed in the pre-buried sleeve, a through-wall pipe is arranged in the pre-buried sleeve in a penetrating and penetrating mode, a filling cavity is formed between the through-wall pipe and the pre-buried sleeve, and the filling cavity communicates with the glue injection opening; the formwork is fixedly installed through a connecting disc, a screw and an embedded sleeve, the glue injection device comprises a glue injection barrel, a glue injection head is installed at the bottom of the glue injection barrel, and a hooking piece is installed on the glue injection barrel. Meanwhile, the invention further discloses a construction method of the outer wall through-wall structure.
本发明解决现有后穿管防水保温密封施工存在防水,保温密封质量差的难题和现有设备无法在墙体施工时一同完成双层套管间填胶完成防水保温密封的难题,具体方案如下:一种被动式超低能耗绿色建筑外墙穿管结构,包括预埋套管、模板和注胶装置,预埋套管的外侧安装有止水环和连接结构,预埋套管上开设有注胶口,预埋套管的内部穿插布设有穿墙管,穿墙管和预埋套管之间布设有填充腔,填充腔和注胶口互通,模板通过连接盘、螺钉和预埋套管固定安装,注胶装置包括注胶桶,注胶桶的底部安装有注胶头,注胶桶上安装有钩挂件。同时还公开外墙穿墙结构的施工方法彻底解决上述难题。
Passive ultralow-energy-consumption green building outer wall pipe penetrating structure and construction method
一种被动式超低能耗绿色建筑外墙穿管结构及施工方法
ZHAO YUXING (Autor:in) / WANG JIA (Autor:in) / ZHOU LINGFENG (Autor:in)
24.10.2023
Patent
Elektronische Ressource
Chinesisch
Passive ultralow-energy-consumption building outer wall heat preservation system
Europäisches Patentamt | 2020
|Ultralow-energy-consumption wood structure outer wall, construction method thereof and building
Europäisches Patentamt | 2022
|Passive ultralow-energy-consumption green fabricated building
Europäisches Patentamt | 2024
|