Road construction marking construction method
The invention discloses a road construction marking construction method which specifically comprises the following steps: step 1, pouring a prepared marking coating into a hopper of marking equipment, further enabling the coating to enter a coating box, further enabling the coating to fall into a vertical groove, and preparing for marking; the invention relates to the technical field of road marking. According to the road construction marking construction method, the first material blocking assembly and the second material blocking assembly are arranged, when the first material blocking assembly is closed and the second material blocking assembly is opened, the solid line marking function can be achieved, and when the second material blocking assembly is closed and the first material blocking assembly is opened, the intermittent material falling function is achieved by starting the intermittent material falling mechanism; according to the line drawing device, the function of drawing the dotted line is achieved, solid line drawing and dotted line drawing can be rapidly switched only by pulling the two pull rings, it is not needed to arrange multiple devices for solid line drawing and dotted line drawing, and the line drawing device is rich in function, easy to switch and convenient to use.
本发明公开了一种道路施工划线施工方法,具体包括以下步骤:步骤一、将调配好的划线涂料倒入划线设备的料斗中,进一步涂料进入涂料箱中,进一步涂料落入竖槽中,准备进行划线;本发明涉及道路划线技术领域。该道路施工划线施工方法,第一挡料组件和第二挡料组件的设置,关闭第一挡料组件打开第二挡料组件时,可实现划出实线的功能,关闭第二挡料组件打开第一挡料组件时,再通过启动间歇落料机构,实现了间歇落料的功能,实现划出虚线的功能,仅通过拉动两个拉环,即可快速切换划实线和划虚线,不需要设置多个设备进行划实线和划虚线,功能丰富,切换简单,使用方便。
Road construction marking construction method
The invention discloses a road construction marking construction method which specifically comprises the following steps: step 1, pouring a prepared marking coating into a hopper of marking equipment, further enabling the coating to enter a coating box, further enabling the coating to fall into a vertical groove, and preparing for marking; the invention relates to the technical field of road marking. According to the road construction marking construction method, the first material blocking assembly and the second material blocking assembly are arranged, when the first material blocking assembly is closed and the second material blocking assembly is opened, the solid line marking function can be achieved, and when the second material blocking assembly is closed and the first material blocking assembly is opened, the intermittent material falling function is achieved by starting the intermittent material falling mechanism; according to the line drawing device, the function of drawing the dotted line is achieved, solid line drawing and dotted line drawing can be rapidly switched only by pulling the two pull rings, it is not needed to arrange multiple devices for solid line drawing and dotted line drawing, and the line drawing device is rich in function, easy to switch and convenient to use.
本发明公开了一种道路施工划线施工方法,具体包括以下步骤:步骤一、将调配好的划线涂料倒入划线设备的料斗中,进一步涂料进入涂料箱中,进一步涂料落入竖槽中,准备进行划线;本发明涉及道路划线技术领域。该道路施工划线施工方法,第一挡料组件和第二挡料组件的设置,关闭第一挡料组件打开第二挡料组件时,可实现划出实线的功能,关闭第二挡料组件打开第一挡料组件时,再通过启动间歇落料机构,实现了间歇落料的功能,实现划出虚线的功能,仅通过拉动两个拉环,即可快速切换划实线和划虚线,不需要设置多个设备进行划实线和划虚线,功能丰富,切换简单,使用方便。
Road construction marking construction method
一种道路施工划线施工方法