Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Complete design method suitable for asymmetric pedestrian leaning tower cable-stayed bridge
The complete design method comprises a cable-stayed bridge body arranged on a main bridge deck, the cable-stayed bridge body comprises a main tower, a stay cable and a beam body and further comprises a pier body, the main tower is arranged on the side edge of the beam body on one side of the main bridge deck, the main tower and the beam body are connected through a side face box type structure, and the pier body is arranged on the side face box type structure. The main tower is arranged at one end of the main bridge deck in the length direction through a pier body, the main tower is obliquely arranged in the direction of the end, on the main bridge deck, of the main tower and obliquely arranged towards the outer side of the main bridge deck, one end of the stay cable is fixedly connected with the upper portion of the main tower, and the end, away from the main tower, of the stay cable is fixed to a beam body of the main bridge deck and located at the opposite side end of the main tower. The main tower and the stay cables of the pedestrian leaning tower cable-stayed bridge do not occupy the bridge floor space, the landscape modeling is reasonable and elegant, meanwhile, the structure is simple, management and maintenance are easy, and stress is reasonable.
本发明公开了一种适用于非对称人行斜塔斜拉桥的成套设计方法,包括设置于主桥桥面上的斜拉桥本体,斜拉桥本体包括主塔、斜拉索以及梁体,还包括墩体,主塔设置于主桥桥面的一侧的梁体侧边,主塔与梁体通过侧面箱型结构连接,主塔通过墩体设置于主桥桥面长度方向的一头,主塔朝主塔在主桥桥面的一头的方向倾斜设置、且朝主桥桥面外侧倾斜设置,斜拉索的一端与主塔上部固定连接,斜拉索远离主塔的一端固定与主桥桥面的梁体上、且位于主塔的对侧端,本发明的人行斜塔斜拉桥的主塔与斜拉索不占用桥面空间,景观造型合理、优雅,同时结构简单,管养维护容易、受力合理。
Complete design method suitable for asymmetric pedestrian leaning tower cable-stayed bridge
The complete design method comprises a cable-stayed bridge body arranged on a main bridge deck, the cable-stayed bridge body comprises a main tower, a stay cable and a beam body and further comprises a pier body, the main tower is arranged on the side edge of the beam body on one side of the main bridge deck, the main tower and the beam body are connected through a side face box type structure, and the pier body is arranged on the side face box type structure. The main tower is arranged at one end of the main bridge deck in the length direction through a pier body, the main tower is obliquely arranged in the direction of the end, on the main bridge deck, of the main tower and obliquely arranged towards the outer side of the main bridge deck, one end of the stay cable is fixedly connected with the upper portion of the main tower, and the end, away from the main tower, of the stay cable is fixed to a beam body of the main bridge deck and located at the opposite side end of the main tower. The main tower and the stay cables of the pedestrian leaning tower cable-stayed bridge do not occupy the bridge floor space, the landscape modeling is reasonable and elegant, meanwhile, the structure is simple, management and maintenance are easy, and stress is reasonable.
本发明公开了一种适用于非对称人行斜塔斜拉桥的成套设计方法,包括设置于主桥桥面上的斜拉桥本体,斜拉桥本体包括主塔、斜拉索以及梁体,还包括墩体,主塔设置于主桥桥面的一侧的梁体侧边,主塔与梁体通过侧面箱型结构连接,主塔通过墩体设置于主桥桥面长度方向的一头,主塔朝主塔在主桥桥面的一头的方向倾斜设置、且朝主桥桥面外侧倾斜设置,斜拉索的一端与主塔上部固定连接,斜拉索远离主塔的一端固定与主桥桥面的梁体上、且位于主塔的对侧端,本发明的人行斜塔斜拉桥的主塔与斜拉索不占用桥面空间,景观造型合理、优雅,同时结构简单,管养维护容易、受力合理。
Complete design method suitable for asymmetric pedestrian leaning tower cable-stayed bridge
一种适用于非对称人行斜塔斜拉桥的成套设计方法
HUANG JIYONG (Autor:in) / HUANG XIAOJIE (Autor:in) / HUANG CAI (Autor:in) / LIU CHENG (Autor:in)
31.10.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Design method of asymmetric leaning tower type cable-stayed landscape bridge
Europäisches Patentamt | 2022
|Control tower locking method of single leaning tower cable-stayed swivel bridge
Europäisches Patentamt | 2022
|Multi-tower asymmetric extradosed cable-stayed bridge
Europäisches Patentamt | 2023
|Leaning tower supports stayed Truss span
Engineering Index Backfile | 1967
Europäisches Patentamt | 2022
|