Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Splicing formwork for reserved steel bars of constructional engineering beam and using method
The invention relates to the technical field of building construction, in particular to a splicing formwork for reserved steel bars of a constructional engineering beam and a using method. Fixing formworks are arranged at the top and the bottom of the connecting plate respectively, a protruding block and a groove which are matched for use are oppositely formed in the two sides of the contact face of the connecting plate and the fixing formworks, first rib penetrating holes are formed in the two sides of the front face of each fixing formwork respectively, a rib penetrating opening is horizontally formed between the first rib penetrating holes, and a foam plate is arranged in each rib penetrating opening. Second rib penetrating holes are formed in the foam plate at intervals. The splicing template can be made of a plastic material, so that the cost is low; after splicing is completed, the surface is flat, and the solid appearance and quality can be guaranteed after concrete pouring is completed; the positions of the reserved steel bars can be fixed through the steel bar holes in the splicing formwork, and the steel bar spacing is guaranteed; during concrete pouring, the splicing formwork can bear the acting force generated during pump pipe pouring, the concrete can be blocked, and slurry leakage is avoided.
本发明涉及建筑施工技术领域,具体是一种建筑工程梁预留钢筋的拼接模板及使用方法。连接板的顶部和底部分别设置有固定模板,连接板和固定模板接触面的两侧相对开设有配合使用的凸块和凹槽,固定模板正面的两侧分别设置有第一穿筋孔,第一穿筋孔之间水平设置有的穿筋口,穿筋口中设置有泡沫板,泡沫板上间隔开设有第二穿筋孔。拼接模板可以塑料材质进行制作,成本低;拼接完成后表面平整,可保证混凝土浇筑完成后实体观感与质量;拼接模板上的钢筋孔可以固定预留钢筋的位置,保证钢筋间距;混凝土浇筑时拼接模板能够承受泵管浇筑时的作用力,足以对混凝土进行封堵作用,避免漏浆。
Splicing formwork for reserved steel bars of constructional engineering beam and using method
The invention relates to the technical field of building construction, in particular to a splicing formwork for reserved steel bars of a constructional engineering beam and a using method. Fixing formworks are arranged at the top and the bottom of the connecting plate respectively, a protruding block and a groove which are matched for use are oppositely formed in the two sides of the contact face of the connecting plate and the fixing formworks, first rib penetrating holes are formed in the two sides of the front face of each fixing formwork respectively, a rib penetrating opening is horizontally formed between the first rib penetrating holes, and a foam plate is arranged in each rib penetrating opening. Second rib penetrating holes are formed in the foam plate at intervals. The splicing template can be made of a plastic material, so that the cost is low; after splicing is completed, the surface is flat, and the solid appearance and quality can be guaranteed after concrete pouring is completed; the positions of the reserved steel bars can be fixed through the steel bar holes in the splicing formwork, and the steel bar spacing is guaranteed; during concrete pouring, the splicing formwork can bear the acting force generated during pump pipe pouring, the concrete can be blocked, and slurry leakage is avoided.
本发明涉及建筑施工技术领域,具体是一种建筑工程梁预留钢筋的拼接模板及使用方法。连接板的顶部和底部分别设置有固定模板,连接板和固定模板接触面的两侧相对开设有配合使用的凸块和凹槽,固定模板正面的两侧分别设置有第一穿筋孔,第一穿筋孔之间水平设置有的穿筋口,穿筋口中设置有泡沫板,泡沫板上间隔开设有第二穿筋孔。拼接模板可以塑料材质进行制作,成本低;拼接完成后表面平整,可保证混凝土浇筑完成后实体观感与质量;拼接模板上的钢筋孔可以固定预留钢筋的位置,保证钢筋间距;混凝土浇筑时拼接模板能够承受泵管浇筑时的作用力,足以对混凝土进行封堵作用,避免漏浆。
Splicing formwork for reserved steel bars of constructional engineering beam and using method
建筑工程梁预留钢筋的拼接模板及使用方法
ZHU SHENGYANG (Autor:in) / LI SHIPENG (Autor:in) / JIANG HONG (Autor:in) / WU HAITAO (Autor:in) / YUAN ZONGSHUANG (Autor:in) / WANG GANG (Autor:in) / WANG XIN (Autor:in) / SUN WENHAO (Autor:in) / ZHANG LIANG (Autor:in) / SHEN XIUWEN (Autor:in)
31.10.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Splicing type building formwork for constructional engineering
Europäisches Patentamt | 2021
|Splicing type building formwork for constructional engineering
Europäisches Patentamt | 2021
|Constructional engineering concrete pouring reinforced section steel formwork
Europäisches Patentamt | 2021
|