Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Energy-saving building steel structure system and mounting process thereof
The invention discloses an energy-saving building steel structure system in the technical field of steel structure buildings, comprising a bottom frame, the side edge of the bottom frame is fixedly connected with a plurality of mounting plates, the mounting plates are slidably connected with a fixing plate, the inner wall of the fixing plate is slidably connected with a vertical rod, and the left and right side walls of the vertical rod are rotatably connected with first support rods; after the fixing plate enters the foundation, the two first supporting rods and the two second supporting rods can be in an unfolded state, and after the second supporting rods are in a horizontal state, the first supporting rods, the second supporting rods and the vertical rods can form a triangular structure, so that transverse supporting force is formed in the mounting grooves; and the fixing plate is more stable and anti-pulling in the fixing groove.
本发明公开了钢结构建筑技术领域的一种节能建筑钢结构体系,包括底框,所述底框侧边固定连接有若干个安装板,所述安装板滑动连接有固定板,所述固定板内壁滑动连接有竖杆,所述竖杆左右两侧壁均转动连接有第一支撑杆,固定板进入地基后,两个第一支撑杆和第二支撑杆会处于展开状态,并且在第二支撑杆处于水平状态后,第一支撑杆、第二支撑杆与竖杆会形成一个三角形的结构,从而在安装槽中形成一个横向的支撑力,使得固定板在固定槽之中更加的稳固、抗拔。
Energy-saving building steel structure system and mounting process thereof
The invention discloses an energy-saving building steel structure system in the technical field of steel structure buildings, comprising a bottom frame, the side edge of the bottom frame is fixedly connected with a plurality of mounting plates, the mounting plates are slidably connected with a fixing plate, the inner wall of the fixing plate is slidably connected with a vertical rod, and the left and right side walls of the vertical rod are rotatably connected with first support rods; after the fixing plate enters the foundation, the two first supporting rods and the two second supporting rods can be in an unfolded state, and after the second supporting rods are in a horizontal state, the first supporting rods, the second supporting rods and the vertical rods can form a triangular structure, so that transverse supporting force is formed in the mounting grooves; and the fixing plate is more stable and anti-pulling in the fixing groove.
本发明公开了钢结构建筑技术领域的一种节能建筑钢结构体系,包括底框,所述底框侧边固定连接有若干个安装板,所述安装板滑动连接有固定板,所述固定板内壁滑动连接有竖杆,所述竖杆左右两侧壁均转动连接有第一支撑杆,固定板进入地基后,两个第一支撑杆和第二支撑杆会处于展开状态,并且在第二支撑杆处于水平状态后,第一支撑杆、第二支撑杆与竖杆会形成一个三角形的结构,从而在安装槽中形成一个横向的支撑力,使得固定板在固定槽之中更加的稳固、抗拔。
Energy-saving building steel structure system and mounting process thereof
一种节能建筑钢结构体系及其安装工艺
07.11.2023
Patent
Elektronische Ressource
Chinesisch
Building energy-saving decorative structure and mounting method thereof
Europäisches Patentamt | 2024
|Quick-mounting steel structure based on building energy-saving technology
Europäisches Patentamt | 2020
|Ecological energy-saving building wall structure and mounting method thereof
Europäisches Patentamt | 2021
|Green building energy-saving wallboard mounting structure and mounting method
Europäisches Patentamt | 2021
|Energy-saving external facade structure of house building and mounting equipment thereof
Europäisches Patentamt | 2023
|