Combined template for shear wall
The invention discloses a shear wall combined template, which relates to the field of constructional engineering construction molds, and comprises a template main body, a pouring pipe assembly and a perpendicularity correction device, the pouring pipe assembly comprises a main pipe, a sleeve and an auxiliary pipe, the main pipe, the sleeve and the auxiliary pipe extend in the vertical direction, the main pipe is close to one short side mold, the sleeve is slidably arranged on the outer side of the main pipe in a sleeving mode, a fastening structure is further arranged on the sleeve, and the sleeve is fastened to the outer side of the main pipe through the fastening structure. The first end of the auxiliary pipe is fixed to the outer side of the sleeve and communicates with the main pipe, and the second end of the auxiliary pipe is fixed to the short side mold corresponding to the main pipe and communicates with the pouring cavity. And the perpendicularity correction device is mounted on one of the long side molds and is far away from the pouring pipe assembly. The times of adjusting the perpendicularity of the fabricated shear wall in the hoisting process of the fabricated shear wall are reduced, so that the hoisting operation of the fabricated shear wall is simple, and the hoisting time is short.
本发明公开了一种剪力墙组合模板,涉及建筑工程施工模具领域,包括模板主体、浇筑管组件和垂直度校正装置;所述浇筑管组件包括沿竖向延伸设置的主管、套筒和副管,所述主管靠近其中一个所述短侧模设置,所述套筒可滑动地套设于所述主管的外侧,所述套筒上还设置有紧固结构,所述紧固结构将所述套筒紧固于所述主管的外侧,所述副管的第一端固定于所述套筒的外侧并与所述主管连通,所述副管的第二端固定于主管对应的所述短侧模上并与所述浇筑腔连通;所述垂直度校正装置安装于所述其中一个所述长侧模上,并远离所述浇筑管组件设置。本发明减少了在装配式剪力墙吊装中,调节装配式剪力墙的垂直度的次数,使得装配式剪力墙吊装的操作简单,时间短。
Combined template for shear wall
The invention discloses a shear wall combined template, which relates to the field of constructional engineering construction molds, and comprises a template main body, a pouring pipe assembly and a perpendicularity correction device, the pouring pipe assembly comprises a main pipe, a sleeve and an auxiliary pipe, the main pipe, the sleeve and the auxiliary pipe extend in the vertical direction, the main pipe is close to one short side mold, the sleeve is slidably arranged on the outer side of the main pipe in a sleeving mode, a fastening structure is further arranged on the sleeve, and the sleeve is fastened to the outer side of the main pipe through the fastening structure. The first end of the auxiliary pipe is fixed to the outer side of the sleeve and communicates with the main pipe, and the second end of the auxiliary pipe is fixed to the short side mold corresponding to the main pipe and communicates with the pouring cavity. And the perpendicularity correction device is mounted on one of the long side molds and is far away from the pouring pipe assembly. The times of adjusting the perpendicularity of the fabricated shear wall in the hoisting process of the fabricated shear wall are reduced, so that the hoisting operation of the fabricated shear wall is simple, and the hoisting time is short.
本发明公开了一种剪力墙组合模板,涉及建筑工程施工模具领域,包括模板主体、浇筑管组件和垂直度校正装置;所述浇筑管组件包括沿竖向延伸设置的主管、套筒和副管,所述主管靠近其中一个所述短侧模设置,所述套筒可滑动地套设于所述主管的外侧,所述套筒上还设置有紧固结构,所述紧固结构将所述套筒紧固于所述主管的外侧,所述副管的第一端固定于所述套筒的外侧并与所述主管连通,所述副管的第二端固定于主管对应的所述短侧模上并与所述浇筑腔连通;所述垂直度校正装置安装于所述其中一个所述长侧模上,并远离所述浇筑管组件设置。本发明减少了在装配式剪力墙吊装中,调节装配式剪力墙的垂直度的次数,使得装配式剪力墙吊装的操作简单,时间短。
Combined template for shear wall
剪力墙组合模板
WANG KAIFEI (Autor:in) / ZHANG BAICHUN (Autor:in) / CAO XUECHENG (Autor:in) / LI TIANLUN (Autor:in) / LIU ZIXIN (Autor:in) / XIONG HUACONG (Autor:in) / CHEN XIZHEN (Autor:in) / YAN JIAWEI (Autor:in) / XIE QINGHUA (Autor:in)
07.11.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Special-shaped shear wall template strengthening structure
Europäisches Patentamt | 2020
|Non-drilled shear wall construction template system and shear wall construction method