Temporary concrete pile column and support connecting structure and construction method
The invention discloses a connecting structure of a temporary concrete pile column and a support and a construction method.The connecting structure comprises the temporary concrete pile column, an embedded steel plate serving as a connecting foundation is arranged in the temporary concrete pile column, and the embedded steel plate is connected with the concrete support through a concrete support connecting assembly; the pre-embedded steel plate is connected with the steel support steel straining beam through the steel support connecting assembly; the construction method comprises the following steps: constructing the enclosure structure, the dewatering well and the temporary concrete piles; the foundation pit is excavated to the position below the concrete supports, and the concrete supports are arranged and connected with the temporary concrete piles; the foundation pit continues to be excavated to the position below the steel supporting and steel straining beams, and the steel supporting and steel straining beams are arranged and connected with the temporary concrete piles; excavating the foundation pit to the bottom of the foundation pit, and then constructing a main body structure; and the concrete supports, the steel support steel tie beams and the temporary concrete piles are cut off. The span reduction problem of the support is achieved, funds are saved compared with construction of steel pipe columns, and the method is safer and more feasible compared with construction of latticed columns.
本发明公开了一种临时混凝土桩柱与支撑的连接结构及施工方法,其连接结构包括临时混凝土桩柱,临时混凝土桩柱中设置有作为连接基础的预埋钢板,预埋钢板通过混凝土支撑连接组件与混凝土支撑相连,预埋钢板通过钢支撑连接组件与钢支撑钢系梁相连;其施工方法,包括以下步骤:施工围护结构、降水井、临时混凝土桩柱;开挖基坑至混凝土支撑下方,设置混凝土支撑,并与临时混凝土桩柱连接;继续开挖基坑至钢支撑钢系梁下方,设置钢支撑钢系梁,并与临时混凝土桩柱连接;开挖基坑至基坑底,然后施工主体结构;割除混凝土支撑、钢支撑钢系梁、临时混凝土桩柱。本发明实现支撑的减跨问题,比施工钢管柱节约了资金,比施工格构柱更安全可行。
Temporary concrete pile column and support connecting structure and construction method
The invention discloses a connecting structure of a temporary concrete pile column and a support and a construction method.The connecting structure comprises the temporary concrete pile column, an embedded steel plate serving as a connecting foundation is arranged in the temporary concrete pile column, and the embedded steel plate is connected with the concrete support through a concrete support connecting assembly; the pre-embedded steel plate is connected with the steel support steel straining beam through the steel support connecting assembly; the construction method comprises the following steps: constructing the enclosure structure, the dewatering well and the temporary concrete piles; the foundation pit is excavated to the position below the concrete supports, and the concrete supports are arranged and connected with the temporary concrete piles; the foundation pit continues to be excavated to the position below the steel supporting and steel straining beams, and the steel supporting and steel straining beams are arranged and connected with the temporary concrete piles; excavating the foundation pit to the bottom of the foundation pit, and then constructing a main body structure; and the concrete supports, the steel support steel tie beams and the temporary concrete piles are cut off. The span reduction problem of the support is achieved, funds are saved compared with construction of steel pipe columns, and the method is safer and more feasible compared with construction of latticed columns.
本发明公开了一种临时混凝土桩柱与支撑的连接结构及施工方法,其连接结构包括临时混凝土桩柱,临时混凝土桩柱中设置有作为连接基础的预埋钢板,预埋钢板通过混凝土支撑连接组件与混凝土支撑相连,预埋钢板通过钢支撑连接组件与钢支撑钢系梁相连;其施工方法,包括以下步骤:施工围护结构、降水井、临时混凝土桩柱;开挖基坑至混凝土支撑下方,设置混凝土支撑,并与临时混凝土桩柱连接;继续开挖基坑至钢支撑钢系梁下方,设置钢支撑钢系梁,并与临时混凝土桩柱连接;开挖基坑至基坑底,然后施工主体结构;割除混凝土支撑、钢支撑钢系梁、临时混凝土桩柱。本发明实现支撑的减跨问题,比施工钢管柱节约了资金,比施工格构柱更安全可行。
Temporary concrete pile column and support connecting structure and construction method
一种临时混凝土桩柱与支撑的连接结构及施工方法
MO CHENG (Autor:in) / YANG FEI (Autor:in) / DING YUESEN (Autor:in) / PAN CHUTIAN (Autor:in) / JIANG YIHUI (Autor:in) / FEI RUIZHEN (Autor:in) / ZHANG CHUANG (Autor:in) / ZHANG CHUNLEI (Autor:in) / JING JIALIANG (Autor:in) / CAO CHUNBO (Autor:in)
10.11.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
CONNECTING STRUCTURE OF PILE AND COLUMN AND CONSTRUCTION METHOD THEREOF
Europäisches Patentamt | 2019
|Europäisches Patentamt | 2024
|Concrete pile connecting structure and precast concrete pile
Europäisches Patentamt | 2022
|Concrete pile connecting structure and precast concrete pile
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|