Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method for mass concrete bottom plate reinforcing steel bar support
The invention discloses a mass concrete bottom plate reinforcing steel bar support construction method. The method comprises the following steps that S1, a construction plan is prepared; s2, preparation of construction equipment; s3, excavation treatment is carried out; s4, stand column positioning; s5, stand column seat cushion welding; s6, stand column welding; s7, welding a middle structural layer; and S8, welding a gluten support. According to the mass concrete bottom plate reinforcing steel bar support construction method, the binding quality of bottom plate reinforcing steel bars and the operation safety of bottom plate construction can be guaranteed, through preparation of the construction technology, the construction process can be prepared, all constructors can clearly know the construction technology, and the construction efficiency is improved. And meanwhile, the materials are treated according to specifications, the construction precision can also be ensured, the problem of subsequent reworking can be avoided, and the stand columns can be flexibly adjusted according to the actual situation on site.
本发明公开了一种大体积混凝土底板钢筋支撑施工方法,包括以下步骤:S1:施工计划的准备;S2:施工机具的准备;S3:开挖处理;S4:立柱定位;S5:立柱座垫焊接;S6:立柱焊接;S7:中间构造层焊接;S8:面筋支架的焊接。本发明所述的一种大体积混凝土底板钢筋支撑施工方法,本方法可以保证底板钢筋的绑扎质量和底板施工的作业安全,通过对施工技术的准备,在进行施工过程中可以有备无患,使得各个施工人员能清除了解施工工艺,以此保证施工的精度,同时按照规范进行材料的处理,同样可以保证施工的精度,能避免出现后续返工的问题处理,且可以根据现场的实际情况对立柱进行灵活调整。
Construction method for mass concrete bottom plate reinforcing steel bar support
The invention discloses a mass concrete bottom plate reinforcing steel bar support construction method. The method comprises the following steps that S1, a construction plan is prepared; s2, preparation of construction equipment; s3, excavation treatment is carried out; s4, stand column positioning; s5, stand column seat cushion welding; s6, stand column welding; s7, welding a middle structural layer; and S8, welding a gluten support. According to the mass concrete bottom plate reinforcing steel bar support construction method, the binding quality of bottom plate reinforcing steel bars and the operation safety of bottom plate construction can be guaranteed, through preparation of the construction technology, the construction process can be prepared, all constructors can clearly know the construction technology, and the construction efficiency is improved. And meanwhile, the materials are treated according to specifications, the construction precision can also be ensured, the problem of subsequent reworking can be avoided, and the stand columns can be flexibly adjusted according to the actual situation on site.
本发明公开了一种大体积混凝土底板钢筋支撑施工方法,包括以下步骤:S1:施工计划的准备;S2:施工机具的准备;S3:开挖处理;S4:立柱定位;S5:立柱座垫焊接;S6:立柱焊接;S7:中间构造层焊接;S8:面筋支架的焊接。本发明所述的一种大体积混凝土底板钢筋支撑施工方法,本方法可以保证底板钢筋的绑扎质量和底板施工的作业安全,通过对施工技术的准备,在进行施工过程中可以有备无患,使得各个施工人员能清除了解施工工艺,以此保证施工的精度,同时按照规范进行材料的处理,同样可以保证施工的精度,能避免出现后续返工的问题处理,且可以根据现场的实际情况对立柱进行灵活调整。
Construction method for mass concrete bottom plate reinforcing steel bar support
一种大体积混凝土底板钢筋支撑施工方法
WANG NI (Autor:in) / SHU JIANYUN (Autor:in) / LIN YUFAN (Autor:in) / HU YONGFENG (Autor:in) / GONG CHAO (Autor:in)
10.11.2023
Patent
Elektronische Ressource
Chinesisch
Construction method for mass concrete bottom plate reinforcing steel bar support
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2021
|Concrete bonding steel plate reinforcing construction process
Europäisches Patentamt | 2020
|Bottom plate reinforcing joint with embedded support and construction method thereof
Europäisches Patentamt | 2021
|Construction method for reinforcing steel plate wall bottom I-shaped steel flange plate hole
Europäisches Patentamt | 2023
|