Construction method of double-wall corrugated pipe formwork for light guide pipe base
The invention relates to a construction method of a double-wall corrugated pipe formwork for a light guide pipe base. The construction method comprises the following steps that firstly, roof steel bars are bound; 2, a light guide pipe mounting position is set on the roof reinforcing steel bars, light guide pipe base reinforcing steel bars are bound, a double-wall corrugated pipe position is reserved in the middle of the light guide pipe base reinforcing steel bars, and a double-wall corrugated pipe is inserted; thirdly, the outer side of the light guide pipe base steel bar is covered with an outer formwork, and the outer side of the outer formwork is fixed through a reinforcing batten; and fourthly, a roof and a light guide pipe base are poured, and after concrete is solidified, the outer formwork is dismantled. Light guide pipe base steel bars are bound on the roof steel bars, the positions of the double-wall corrugated pipes are reserved in the middles of the light guide pipe base steel bars, and the double-wall corrugated pipes are inserted into the light guide pipe base steel bars to serve as inner formworks of bases; the outer side of the light guide pipe base steel bar is covered with the outer formwork, the outer side of the outer formwork is fixed through the reinforcing batten, the firmness degree of the base formwork is increased, and meanwhile the problems that a circular light guide pipe construction formwork is large in forming difficulty and prone to loosening during pouring are solved.
本发明涉及导光管基座用双壁波纹管支模的施工方法,包括以下步骤:步骤一:绑扎屋面钢筋;步骤二:在屋面钢筋上设定导光管安装位置,并绑扎导光管基座钢筋,在导光管基座钢筋中间预留双壁波纹管位置,插入双壁波纹管;步骤三:导光管基座钢筋的外侧覆盖外模板,外模板外侧通过加固木方固定;步骤四:浇筑屋面和导光管基座,待混凝土凝固后,拆除外模板。在屋面钢筋上绑扎导光管基座钢筋,导光管基座钢筋中间预留双壁波纹管位置,插入双壁波纹管作为基座的内模板;导光管基座钢筋外侧覆盖外模板,外模板外侧再使用加固木方固定,增加了基座模板的牢固程度,同时解决了圆形导光管施工模板成型难度大、浇筑时易松动的问题。
Construction method of double-wall corrugated pipe formwork for light guide pipe base
The invention relates to a construction method of a double-wall corrugated pipe formwork for a light guide pipe base. The construction method comprises the following steps that firstly, roof steel bars are bound; 2, a light guide pipe mounting position is set on the roof reinforcing steel bars, light guide pipe base reinforcing steel bars are bound, a double-wall corrugated pipe position is reserved in the middle of the light guide pipe base reinforcing steel bars, and a double-wall corrugated pipe is inserted; thirdly, the outer side of the light guide pipe base steel bar is covered with an outer formwork, and the outer side of the outer formwork is fixed through a reinforcing batten; and fourthly, a roof and a light guide pipe base are poured, and after concrete is solidified, the outer formwork is dismantled. Light guide pipe base steel bars are bound on the roof steel bars, the positions of the double-wall corrugated pipes are reserved in the middles of the light guide pipe base steel bars, and the double-wall corrugated pipes are inserted into the light guide pipe base steel bars to serve as inner formworks of bases; the outer side of the light guide pipe base steel bar is covered with the outer formwork, the outer side of the outer formwork is fixed through the reinforcing batten, the firmness degree of the base formwork is increased, and meanwhile the problems that a circular light guide pipe construction formwork is large in forming difficulty and prone to loosening during pouring are solved.
本发明涉及导光管基座用双壁波纹管支模的施工方法,包括以下步骤:步骤一:绑扎屋面钢筋;步骤二:在屋面钢筋上设定导光管安装位置,并绑扎导光管基座钢筋,在导光管基座钢筋中间预留双壁波纹管位置,插入双壁波纹管;步骤三:导光管基座钢筋的外侧覆盖外模板,外模板外侧通过加固木方固定;步骤四:浇筑屋面和导光管基座,待混凝土凝固后,拆除外模板。在屋面钢筋上绑扎导光管基座钢筋,导光管基座钢筋中间预留双壁波纹管位置,插入双壁波纹管作为基座的内模板;导光管基座钢筋外侧覆盖外模板,外模板外侧再使用加固木方固定,增加了基座模板的牢固程度,同时解决了圆形导光管施工模板成型难度大、浇筑时易松动的问题。
Construction method of double-wall corrugated pipe formwork for light guide pipe base
导光管基座用双壁波纹管支模的施工方法
CUI JIANPENG (Autor:in) / LIU CHUNFENG (Autor:in) / SHEN XIUWEN (Autor:in) / SONG YUE (Autor:in) / HAO XULONG (Autor:in) / WANG NING (Autor:in) / KANG YOUWEI (Autor:in) / WU ZIYU (Autor:in) / GUO WEIHUA (Autor:in) / WEI LIN (Autor:in)
10.11.2023
Patent
Elektronische Ressource
Chinesisch
Fair-faced concrete construction method for PE double-wall corrugated pipe cylindrical formwork
Europäisches Patentamt | 2023
|Construction method of HDPE double-wall corrugated pipe drainage ditch
Europäisches Patentamt | 2021
|EGG-SHAPED DOUBLE WALL CORRUGATED PIPE AND ASSEMBLY FOR CONSTRUCTION
Europäisches Patentamt | 2022
|EGG-SHAPED DOUBLE WALL CORRUGATED PIPE AND ASSEMBLY FOR CONSTRUCTION
Europäisches Patentamt | 2022