Prefabricated wallboard and post-poured concrete combination method
The invention discloses a prefabricated wallboard and post-poured concrete combination method, and relates to the technical field of prefabricated wallboard and post-poured concrete combination, transportation and raw material treatment.The prefabricated wallboard needing to be assembled is taken out, meanwhile, concrete raw materials needing to be treated are weighed, and the prefabricated wallboard comprises a prefabricated wallboard body; a square strip block limiting groove is formed in one end of the prefabricated wallboard body, a limiting square strip block is arranged on the other side of the prefabricated wallboard body, limiting square blocks are arranged on the two sides of the limiting square strip block, the limiting square blocks and the limiting square strip block are fixedly connected through supporting soft vertical column blocks, anti-skid upper soft cushions are arranged above the limiting square blocks, and anti-skid lower soft cushions are arranged above the limiting square blocks. According to the prefabricated wallboard and post-poured concrete combination method, through the design of the supporting soft vertical column block, the anti-skid upper soft cushion and the limiting square block can be fixed more conveniently, and through the combined design of the elements, the fastening performance of the prefabricated wallboard during splicing can be effectively improved.
本发明公开了预制墙板与后浇混凝土结合方法,涉及预制墙板浇筑混凝土结合技术领域,运输及原料处理,先将需要进行装配的预制墙板取出,同时将需要进行处理的混凝土原料进行称量处理,其中,预制墙板包括预制墙板主体,所述预制墙板主体的一端设置有方条块限位凹槽,所述预制墙板主体的另一侧设置有限位方条块,所述限位方条块的两侧均设置有限位方块,且限位方块与限位方条块通过支撑软竖柱块固定连接,所述限位方块的上方设置有防滑上软垫,该种预制墙板与后浇混凝土结合方法通过支撑软竖柱块的设计可以让防滑上软垫和限位方块的固定更加方便,上述元件的组合设计可以有效增加了预制墙板在进行拼接时的紧固性。
Prefabricated wallboard and post-poured concrete combination method
The invention discloses a prefabricated wallboard and post-poured concrete combination method, and relates to the technical field of prefabricated wallboard and post-poured concrete combination, transportation and raw material treatment.The prefabricated wallboard needing to be assembled is taken out, meanwhile, concrete raw materials needing to be treated are weighed, and the prefabricated wallboard comprises a prefabricated wallboard body; a square strip block limiting groove is formed in one end of the prefabricated wallboard body, a limiting square strip block is arranged on the other side of the prefabricated wallboard body, limiting square blocks are arranged on the two sides of the limiting square strip block, the limiting square blocks and the limiting square strip block are fixedly connected through supporting soft vertical column blocks, anti-skid upper soft cushions are arranged above the limiting square blocks, and anti-skid lower soft cushions are arranged above the limiting square blocks. According to the prefabricated wallboard and post-poured concrete combination method, through the design of the supporting soft vertical column block, the anti-skid upper soft cushion and the limiting square block can be fixed more conveniently, and through the combined design of the elements, the fastening performance of the prefabricated wallboard during splicing can be effectively improved.
本发明公开了预制墙板与后浇混凝土结合方法,涉及预制墙板浇筑混凝土结合技术领域,运输及原料处理,先将需要进行装配的预制墙板取出,同时将需要进行处理的混凝土原料进行称量处理,其中,预制墙板包括预制墙板主体,所述预制墙板主体的一端设置有方条块限位凹槽,所述预制墙板主体的另一侧设置有限位方条块,所述限位方条块的两侧均设置有限位方块,且限位方块与限位方条块通过支撑软竖柱块固定连接,所述限位方块的上方设置有防滑上软垫,该种预制墙板与后浇混凝土结合方法通过支撑软竖柱块的设计可以让防滑上软垫和限位方块的固定更加方便,上述元件的组合设计可以有效增加了预制墙板在进行拼接时的紧固性。
Prefabricated wallboard and post-poured concrete combination method
预制墙板与后浇混凝土结合方法
ZHANG HAO (Autor:in) / MA YONGJIANG (Autor:in)
10.11.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction method for post-poured concrete of prefabricated composite floor slabs
Europäisches Patentamt | 2015
|