Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bailey beam dismantling device in bridge engineering and construction method thereof
The invention relates to the technical field of bridge construction, in particular to a Bailey beam dismantling device in bridge engineering and a construction method thereof.The Bailey beam dismantling device comprises a bridge and a supporting column, a dismantling and hoisting mechanism is slidably placed at the top end of the bridge, Bailey beams are slidably installed at the top end of the supporting column at equal intervals, and the dismantling and hoisting mechanism comprises a butt joint component, a sleeve and a sliding rod; the sleeve and the sliding rod are fixedly installed at the opposite ends of the butt joint component, the sliding rod is inserted into the sleeve in a sliding mode, the butt joint component comprises a transmission device, a sleeving device and a matching device, the matching device and the sleeving device are fixedly connected to the two ends of the transmission device, and the sleeving device is located above the matching device. The transmission device comprises a motor, an equipment shell, a first connecting rope, a worm gear, a worm, a hydraulic air cylinder, a gear, a supporting shaft and a rack. The motor is fixedly installed at the top end in the equipment shell. And through the arrangement of the dismounting and hoisting mechanism, the aim of synchronously collecting, releasing, hoisting and unloading the bailey beam is achieved.
本发明涉及桥梁建设技术领域,具体的说是一种桥梁工程中贝雷梁拆除装置及其施工方法,包括桥梁和支撑柱,桥梁的顶端上滑动放置有拆卸吊运机构,支撑柱的顶端等距滑动安装有贝雷梁,拆卸吊运机构包括对接部件、套管和滑杆,套管和滑杆固定安装在对接部件相对的一端上,且滑杆滑动插接在套管的内部,对接部件包括传动装置、套接装置和匹配装置,匹配装置和套接装置固定连接在传动装置的两端上,且套接装置位于匹配装置的上方,传动装置包括电机、设备外壳、第一连接绳、蜗轮、蜗杆、液压气缸、齿轮、支撑轴和齿条,电机固定安装在设备外壳的内部顶端。通过拆卸吊运机构的设置,实现了贝雷梁进行同步式收放吊卸的目的。
Bailey beam dismantling device in bridge engineering and construction method thereof
The invention relates to the technical field of bridge construction, in particular to a Bailey beam dismantling device in bridge engineering and a construction method thereof.The Bailey beam dismantling device comprises a bridge and a supporting column, a dismantling and hoisting mechanism is slidably placed at the top end of the bridge, Bailey beams are slidably installed at the top end of the supporting column at equal intervals, and the dismantling and hoisting mechanism comprises a butt joint component, a sleeve and a sliding rod; the sleeve and the sliding rod are fixedly installed at the opposite ends of the butt joint component, the sliding rod is inserted into the sleeve in a sliding mode, the butt joint component comprises a transmission device, a sleeving device and a matching device, the matching device and the sleeving device are fixedly connected to the two ends of the transmission device, and the sleeving device is located above the matching device. The transmission device comprises a motor, an equipment shell, a first connecting rope, a worm gear, a worm, a hydraulic air cylinder, a gear, a supporting shaft and a rack. The motor is fixedly installed at the top end in the equipment shell. And through the arrangement of the dismounting and hoisting mechanism, the aim of synchronously collecting, releasing, hoisting and unloading the bailey beam is achieved.
本发明涉及桥梁建设技术领域,具体的说是一种桥梁工程中贝雷梁拆除装置及其施工方法,包括桥梁和支撑柱,桥梁的顶端上滑动放置有拆卸吊运机构,支撑柱的顶端等距滑动安装有贝雷梁,拆卸吊运机构包括对接部件、套管和滑杆,套管和滑杆固定安装在对接部件相对的一端上,且滑杆滑动插接在套管的内部,对接部件包括传动装置、套接装置和匹配装置,匹配装置和套接装置固定连接在传动装置的两端上,且套接装置位于匹配装置的上方,传动装置包括电机、设备外壳、第一连接绳、蜗轮、蜗杆、液压气缸、齿轮、支撑轴和齿条,电机固定安装在设备外壳的内部顶端。通过拆卸吊运机构的设置,实现了贝雷梁进行同步式收放吊卸的目的。
Bailey beam dismantling device in bridge engineering and construction method thereof
一种桥梁工程中贝雷梁拆除装置及其施工方法
ZHAO BIN (Autor:in) / LI TIANTIAN (Autor:in) / HU MIAO (Autor:in) / LI TIAN (Autor:in) / WANG BO (Autor:in) / GUO DONGDONG (Autor:in)
14.11.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Bailey beam dismantling construction method in bridge engineering
Europäisches Patentamt | 2020
|Device for dismantling bailey beam and construction method thereof
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2024
|Bailey beam dismantling and transporting device and construction method applying same
Europäisches Patentamt | 2020
|