Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction engineering building climbing frame
The invention provides a building engineering building climbing frame which comprises a first mounting rod, a second mounting rod, a connecting rod and a foot rest lever, the first mounting rod and the second mounting rod are oppositely arranged, and a first inserting groove and a second inserting groove allowing the two ends of the foot rest lever to be inserted are formed in the opposite faces of the first mounting rod and the second mounting rod; the connecting rods are arranged at the upper ends and the lower ends of the first mounting rod and the second mounting rod, and the first ends of the connecting rods are in transmission connection with a driving mechanism in the first mounting rod and are driven by the driving mechanism to horizontally move relative to the first mounting rod. And the second end of the connecting rod is fixedly connected with the second mounting rod. By using the building climbing frame for the constructional engineering, the foot rest lever can be conveniently and quickly disassembled and replaced.
本发明提供一种建筑工程建筑爬架,其包括第一安装杆、第二安装杆、连接杆和脚踏杆,所述第一安装杆和所述第二安装杆相对设立且相对面上开设有供所述脚踏杆两端分别插设的第一插槽和第二插槽;所述连接杆设于所述第一安装杆和所述第二安装杆的上下两端,所述连接杆的第一端与所述第一安装杆内的驱动机构传动连接并且在所述驱动机构的驱使下相对于所述第一安装杆作水平移动,所述连接杆的第二端与所述第二安装杆固定连接。使用本发明的建筑工程建筑爬架,能够方便快捷地拆卸并更换脚踏杆。
Construction engineering building climbing frame
The invention provides a building engineering building climbing frame which comprises a first mounting rod, a second mounting rod, a connecting rod and a foot rest lever, the first mounting rod and the second mounting rod are oppositely arranged, and a first inserting groove and a second inserting groove allowing the two ends of the foot rest lever to be inserted are formed in the opposite faces of the first mounting rod and the second mounting rod; the connecting rods are arranged at the upper ends and the lower ends of the first mounting rod and the second mounting rod, and the first ends of the connecting rods are in transmission connection with a driving mechanism in the first mounting rod and are driven by the driving mechanism to horizontally move relative to the first mounting rod. And the second end of the connecting rod is fixedly connected with the second mounting rod. By using the building climbing frame for the constructional engineering, the foot rest lever can be conveniently and quickly disassembled and replaced.
本发明提供一种建筑工程建筑爬架,其包括第一安装杆、第二安装杆、连接杆和脚踏杆,所述第一安装杆和所述第二安装杆相对设立且相对面上开设有供所述脚踏杆两端分别插设的第一插槽和第二插槽;所述连接杆设于所述第一安装杆和所述第二安装杆的上下两端,所述连接杆的第一端与所述第一安装杆内的驱动机构传动连接并且在所述驱动机构的驱使下相对于所述第一安装杆作水平移动,所述连接杆的第二端与所述第二安装杆固定连接。使用本发明的建筑工程建筑爬架,能够方便快捷地拆卸并更换脚踏杆。
Construction engineering building climbing frame
建筑工程建筑爬架
MAO YUJIA (Autor:in) / LI GUANG (Autor:in) / HU XIANGGANG (Autor:in) / ZHANG QINGLIN (Autor:in) / LIU ZHI (Autor:in) / ZHANG DAIXING (Autor:in)
14.11.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Climbing frame fixing structure and building construction climbing frame
Europäisches Patentamt | 2023
|Climbing system of high-rise building construction climbing frame
Europäisches Patentamt | 2023
|