Hyperbola cooling tower cylinder wall construction method
The invention discloses a hyperbolic cooling tower cylinder wall construction method. The method comprises the following steps that S1, pollution of construction joints and steel bars is cleaned, and the construction joints are watered and maintained; s2, checking reinforcing steel bars and a protective layer; s3, checking a ground center point and a disc center, and positioning a rib template; s4, checking the radius of the cylinder wall; s5, template abutted seam tightness inspection and radian inspection are carried out; s6, upper opening screws of the upper section formwork are fastened; s7, a formwork supporting system is checked; s8, concrete is poured into the side station; s9, retaining and marking a test block; s10, removing the mold and taking the test block to a laboratory for pressure test; and S11, releasing a form removal order, and maintaining the cylinder wall and the form after form removal. According to the method, all links of technology, quality and safety management in the barrel wall construction process are comprehensively controlled, and it is ensured that management and control traces of all the links are well documented; the management efficiency is improved, the management pertinence is high, the management division is clear, the management trace is obvious, and later rectification and improvement are facilitated.
本发明公开了一种双曲线冷却塔筒壁施工方法,包括以下步骤:S1、施工缝及钢筋污染清理,施工缝洒水养护;S2、钢筋及保护层检查;S3、地面中心点及圆盘中心检查,肋条模板定位;S4、筒壁半径检查;S5、模板拼缝严密性检查、弧度检查;S6、上节模板上口螺丝紧固;S7、模板支撑体系检查;S8、混凝土浇筑旁站;S9、试块留置并标记;S10、拆模拿取试块至实验室试压;S11、拆模令发布,拆模后对筒壁及模板进行养护。本发明包含对筒壁施工过程中的技术、质量、安全管理的各个环节进行全方位把控,确保各个环节的管控痕迹有据可查;管理效率提高,管理的针对性强,管理的分工明确,同时管理痕迹明显,便于后期整改提升。
Hyperbola cooling tower cylinder wall construction method
The invention discloses a hyperbolic cooling tower cylinder wall construction method. The method comprises the following steps that S1, pollution of construction joints and steel bars is cleaned, and the construction joints are watered and maintained; s2, checking reinforcing steel bars and a protective layer; s3, checking a ground center point and a disc center, and positioning a rib template; s4, checking the radius of the cylinder wall; s5, template abutted seam tightness inspection and radian inspection are carried out; s6, upper opening screws of the upper section formwork are fastened; s7, a formwork supporting system is checked; s8, concrete is poured into the side station; s9, retaining and marking a test block; s10, removing the mold and taking the test block to a laboratory for pressure test; and S11, releasing a form removal order, and maintaining the cylinder wall and the form after form removal. According to the method, all links of technology, quality and safety management in the barrel wall construction process are comprehensively controlled, and it is ensured that management and control traces of all the links are well documented; the management efficiency is improved, the management pertinence is high, the management division is clear, the management trace is obvious, and later rectification and improvement are facilitated.
本发明公开了一种双曲线冷却塔筒壁施工方法,包括以下步骤:S1、施工缝及钢筋污染清理,施工缝洒水养护;S2、钢筋及保护层检查;S3、地面中心点及圆盘中心检查,肋条模板定位;S4、筒壁半径检查;S5、模板拼缝严密性检查、弧度检查;S6、上节模板上口螺丝紧固;S7、模板支撑体系检查;S8、混凝土浇筑旁站;S9、试块留置并标记;S10、拆模拿取试块至实验室试压;S11、拆模令发布,拆模后对筒壁及模板进行养护。本发明包含对筒壁施工过程中的技术、质量、安全管理的各个环节进行全方位把控,确保各个环节的管控痕迹有据可查;管理效率提高,管理的针对性强,管理的分工明确,同时管理痕迹明显,便于后期整改提升。
Hyperbola cooling tower cylinder wall construction method
一种双曲线冷却塔筒壁施工方法
ZHOU YUCHENG (Autor:in) / WANG TIEZHU (Autor:in) / TIAN WEI (Autor:in) / LI JIE (Autor:in) / ZHANG GUIFA (Autor:in) / LI RUIYANG (Autor:in)
14.11.2023
Patent
Elektronische Ressource
Chinesisch
Large-diameter hyperbolic cooling tower cylinder wall construction method