Concrete dismantling execution front end of runner chamber of water-turbine generator set and use method thereof
The invention relates to a hydraulic turbine generator set runner chamber concrete dismantling execution front end and a using method thereof, the hydraulic turbine generator set runner chamber concrete dismantling execution front end comprises a reducing module, a rotating module, an angle adjusting module, a transverse moving module, a left-right swinging module and an up-down swinging module, the lower end of the rotating module is installed at the movable end of the reducing module, and the upper end of the rotating module is connected with the angle adjusting module; the transverse moving module is installed on the upper side of the angle adjusting module, the left-right swing module is installed on the transverse moving module, the up-down swing module is installed on the left-right swing module, and the high-pressure spray gun is installed on the up-down swing module. The structure freedom degree is high, runner chamber concrete can be demolished in radial, axial and other multi-angle modes, the high-pressure spray gun is under the action of the left-right swing module and the up-down swing module at the same time, the high-pressure water single-time demolition acting face is wider, demolition is more sufficient, the construction efficiency is high, and the phenomenon of over-excavation and under-excavation of concrete is reduced; and the damage to a concrete dismantling interface area is avoided.
水轮发电机组转轮室混凝土拆除执行前端及其使用方法,它包括变径模块、旋转模块、角度调整模块、横移模块、左右摆动模块、上下摆动模块,旋转模块下端安装在变径模块的活动端,旋转模块的上端与角度调整模块安装连接,横移模块安装在角度调整模块的上侧,左右摆动模块安装横移模块上,上下摆动模块安装在左右摆动模块上,高压喷枪安装在上下摆动模块上。结构自由度高,能够对转轮室混凝土进行径向、轴向及其他多角度拆除,高压喷枪同时在左右摆动模块和上下摆动模块的作用下,高压水单次拆除作用面更广,拆除更充分,施工效率高,减少混凝土超欠挖现象的出现,不会造成混凝土拆除界面区域的损坏。
Concrete dismantling execution front end of runner chamber of water-turbine generator set and use method thereof
The invention relates to a hydraulic turbine generator set runner chamber concrete dismantling execution front end and a using method thereof, the hydraulic turbine generator set runner chamber concrete dismantling execution front end comprises a reducing module, a rotating module, an angle adjusting module, a transverse moving module, a left-right swinging module and an up-down swinging module, the lower end of the rotating module is installed at the movable end of the reducing module, and the upper end of the rotating module is connected with the angle adjusting module; the transverse moving module is installed on the upper side of the angle adjusting module, the left-right swing module is installed on the transverse moving module, the up-down swing module is installed on the left-right swing module, and the high-pressure spray gun is installed on the up-down swing module. The structure freedom degree is high, runner chamber concrete can be demolished in radial, axial and other multi-angle modes, the high-pressure spray gun is under the action of the left-right swing module and the up-down swing module at the same time, the high-pressure water single-time demolition acting face is wider, demolition is more sufficient, the construction efficiency is high, and the phenomenon of over-excavation and under-excavation of concrete is reduced; and the damage to a concrete dismantling interface area is avoided.
水轮发电机组转轮室混凝土拆除执行前端及其使用方法,它包括变径模块、旋转模块、角度调整模块、横移模块、左右摆动模块、上下摆动模块,旋转模块下端安装在变径模块的活动端,旋转模块的上端与角度调整模块安装连接,横移模块安装在角度调整模块的上侧,左右摆动模块安装横移模块上,上下摆动模块安装在左右摆动模块上,高压喷枪安装在上下摆动模块上。结构自由度高,能够对转轮室混凝土进行径向、轴向及其他多角度拆除,高压喷枪同时在左右摆动模块和上下摆动模块的作用下,高压水单次拆除作用面更广,拆除更充分,施工效率高,减少混凝土超欠挖现象的出现,不会造成混凝土拆除界面区域的损坏。
Concrete dismantling execution front end of runner chamber of water-turbine generator set and use method thereof
水轮发电机组转轮室混凝土拆除执行前端及其使用方法
ZHU QUANPING (Autor:in) / LI JUNJIE (Autor:in) / YANG LINZHEN (Autor:in) / LAN PENG (Autor:in) / WAN GANG (Autor:in) / ZHANG YI (Autor:in) / XIANG LEILEI (Autor:in) / YE DEZHEN (Autor:in) / TU SHUHAO (Autor:in) / ZHANG XIAOYU (Autor:in)
14.11.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Europäisches Patentamt | 2023
|Concrete dismantling system for runner chamber of water-turbine generator set and using method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Hydropower station runner chamber concrete high-pressure water jet dismantling construction method
Europäisches Patentamt | 2023
|Hydropower station runner chamber dismantling system and operation method thereof
Europäisches Patentamt | 2023
|