Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to the technical field of steel pipe piles, and discloses a prestressed steel pipe concrete pipe pile and a using method thereof.The prestressed steel pipe concrete pipe pile comprises an overall external mechanism, the overall external mechanism further comprises an overall chassis, the prestressed steel pipe concrete pipe pile is provided with a bottom fixing mechanism, and soil from the soil surface to the underground by 40 cm has the characteristics of being slightly dry and poor in earthquake resistance due to fine crushing; the soil below 40 cm is wet, soft and poor in fixity, the foundation needs to be deeply buried to 100 cm according to a normal villa construction link, in the foundation fixing process, a bottom fixing mechanism extends outwards due to soil resistance, a part of ground surface fine and dry soil is stored in a fixing main column, and after the soil is deeply buried, the ground surface is fixed to the ground. The problems that the diurnal temperature difference in suburban areas is large, the overall stone plate outer wall is poor in thermal conductivity and low in temperature, and the overall condensation plate is a metal product and high in thermal conductivity and absorbs the surrounding temperature are utilized, and the condensation phenomenon in the suburban areas is avoided.
本发明涉及钢管管桩技术领域,且公开了一种预应力钢管混凝土管桩及其使用方法,包括整体外部机构,所述整体外部机构还包括有整体底盘,本发明设计有底部固定机构,土壤表面至地下40厘米土壤的特性为偏干燥、细碎抗震性较差,40厘米往下土壤特性为潮湿、松软,固定性较差,按照正常小别墅施工环节应将地基深埋至100公分,当本发明地基在固定过程中,底部固定机构受泥土阻力向外延伸,并使固定主柱内部存储一部分地表细碎、干燥的土壤,在进行深入后,与地底较潮湿的泥土进行混合,使设备更加稳固,利用了郊外地区昼夜温差比较大,整体石板外壁导热性较差,温度偏低,整体凝露板为金属制品导热性较高,吸收四周温度,避免内部发生凝露现象。
The invention relates to the technical field of steel pipe piles, and discloses a prestressed steel pipe concrete pipe pile and a using method thereof.The prestressed steel pipe concrete pipe pile comprises an overall external mechanism, the overall external mechanism further comprises an overall chassis, the prestressed steel pipe concrete pipe pile is provided with a bottom fixing mechanism, and soil from the soil surface to the underground by 40 cm has the characteristics of being slightly dry and poor in earthquake resistance due to fine crushing; the soil below 40 cm is wet, soft and poor in fixity, the foundation needs to be deeply buried to 100 cm according to a normal villa construction link, in the foundation fixing process, a bottom fixing mechanism extends outwards due to soil resistance, a part of ground surface fine and dry soil is stored in a fixing main column, and after the soil is deeply buried, the ground surface is fixed to the ground. The problems that the diurnal temperature difference in suburban areas is large, the overall stone plate outer wall is poor in thermal conductivity and low in temperature, and the overall condensation plate is a metal product and high in thermal conductivity and absorbs the surrounding temperature are utilized, and the condensation phenomenon in the suburban areas is avoided.
本发明涉及钢管管桩技术领域,且公开了一种预应力钢管混凝土管桩及其使用方法,包括整体外部机构,所述整体外部机构还包括有整体底盘,本发明设计有底部固定机构,土壤表面至地下40厘米土壤的特性为偏干燥、细碎抗震性较差,40厘米往下土壤特性为潮湿、松软,固定性较差,按照正常小别墅施工环节应将地基深埋至100公分,当本发明地基在固定过程中,底部固定机构受泥土阻力向外延伸,并使固定主柱内部存储一部分地表细碎、干燥的土壤,在进行深入后,与地底较潮湿的泥土进行混合,使设备更加稳固,利用了郊外地区昼夜温差比较大,整体石板外壁导热性较差,温度偏低,整体凝露板为金属制品导热性较高,吸收四周温度,避免内部发生凝露现象。
Large-diameter vertical prestressed concrete filled steel tube pile structure
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2022
|Prestressed concrete filled steel tube sleeper and preparation method thereof
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2021
|