Construction method and system for high-fill roadbed in mountainous area
The invention relates to the field of building equipment, in particular to a mountainous area high-fill roadbed construction method and system, a base is supported through a mover, so that the base can move under the support of the mover, and raw materials used for paving a roadbed can be poured to a place needing to be paved through a feeding assembly; according to the specific mode, raw materials are put into a feeding box, then a cover plate is closed for protection, the amount of the raw materials can be detected through an alarm, when discharging is needed, a valve can be opened, the raw materials enter a discharging frame through the valve and finally flow to the ground, then a supporting rod and a pressing roller are put down to make contact with the ground, and a mover continues to be moved; and the pressing rollers can press the raw materials, so that a roadbed can be laid more conveniently, and the working efficiency is improved.
本发明涉及建筑设备领域,具体涉及一种山区高填方路基施工方法及系统,通过移动器对底座进行支撑,使得底座可以在移动器的支撑下进行移动,通过上料组件可以将铺设路基所用到的原材料倒到需要进行铺设的地方,具体方式是在上料箱中放入原材料,然后关闭盖板进行保护,通过报警器可以对原材料的量进行检测,在需要下料时,可以打开阀门,使得原材料通过阀门进入到下料框中,最终流到地面上,然后将支撑杆和压辊放下接触地面,继续移动移动器,使得压辊可以对原材料进行压合,使得可以更加方便地进行路基的铺设,提高工作效率。
Construction method and system for high-fill roadbed in mountainous area
The invention relates to the field of building equipment, in particular to a mountainous area high-fill roadbed construction method and system, a base is supported through a mover, so that the base can move under the support of the mover, and raw materials used for paving a roadbed can be poured to a place needing to be paved through a feeding assembly; according to the specific mode, raw materials are put into a feeding box, then a cover plate is closed for protection, the amount of the raw materials can be detected through an alarm, when discharging is needed, a valve can be opened, the raw materials enter a discharging frame through the valve and finally flow to the ground, then a supporting rod and a pressing roller are put down to make contact with the ground, and a mover continues to be moved; and the pressing rollers can press the raw materials, so that a roadbed can be laid more conveniently, and the working efficiency is improved.
本发明涉及建筑设备领域,具体涉及一种山区高填方路基施工方法及系统,通过移动器对底座进行支撑,使得底座可以在移动器的支撑下进行移动,通过上料组件可以将铺设路基所用到的原材料倒到需要进行铺设的地方,具体方式是在上料箱中放入原材料,然后关闭盖板进行保护,通过报警器可以对原材料的量进行检测,在需要下料时,可以打开阀门,使得原材料通过阀门进入到下料框中,最终流到地面上,然后将支撑杆和压辊放下接触地面,继续移动移动器,使得压辊可以对原材料进行压合,使得可以更加方便地进行路基的铺设,提高工作效率。
Construction method and system for high-fill roadbed in mountainous area
一种山区高填方路基施工方法及系统
FANG XIAODONG (Autor:in) / ZHANG JIMING (Autor:in) / MA BO (Autor:in) / LONG WEI (Autor:in) / JIANG XIN (Autor:in)
21.11.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Mountainous area slope high-filled roadbed reinforced flexible culvert and construction method