Longitudinal construction method for road transformation in alpine and valley areas
The invention discloses a longitudinal construction method for alpine and valley road transformation, and solves the problems that traffic jam is easy to occur and even bad social influence and serious economic loss are caused in a conventional single traffic protection scheme. The method is divided into three different traffic road sections, namely, 1, a road section for driving by using an old road, 2, a road section for half-range construction and half-range traffic passing, and 3, a road section for half-range traffic passing by using a shortcut and a temporary bridge, and specifically comprises the steps of S1, excavation road section construction and traffic passing, S2, filling road section construction and traffic passing, S3, half-range construction and half-range traffic passing and traffic passing, and S4, temporary traffic shortcut and temporary bridge building.
一种高山峡谷道路改造纵向施工方法,解决常规的单一保通方案易出现交通堵塞,甚至造成不良的社会影响和重大的经济损失的问题。其分为三种不同的通车路段,1、利用旧路行车的路段,2、半幅施工半幅通车的路段,3、利用便道、便函保通的路段,其具体步骤为:S1、挖方路段施工保通,S2、填方路段施工保通,S3、半幅施工半幅通车保通,S4、修建临时行车便道、便桥措施。
Longitudinal construction method for road transformation in alpine and valley areas
The invention discloses a longitudinal construction method for alpine and valley road transformation, and solves the problems that traffic jam is easy to occur and even bad social influence and serious economic loss are caused in a conventional single traffic protection scheme. The method is divided into three different traffic road sections, namely, 1, a road section for driving by using an old road, 2, a road section for half-range construction and half-range traffic passing, and 3, a road section for half-range traffic passing by using a shortcut and a temporary bridge, and specifically comprises the steps of S1, excavation road section construction and traffic passing, S2, filling road section construction and traffic passing, S3, half-range construction and half-range traffic passing and traffic passing, and S4, temporary traffic shortcut and temporary bridge building.
一种高山峡谷道路改造纵向施工方法,解决常规的单一保通方案易出现交通堵塞,甚至造成不良的社会影响和重大的经济损失的问题。其分为三种不同的通车路段,1、利用旧路行车的路段,2、半幅施工半幅通车的路段,3、利用便道、便函保通的路段,其具体步骤为:S1、挖方路段施工保通,S2、填方路段施工保通,S3、半幅施工半幅通车保通,S4、修建临时行车便道、便桥措施。
Longitudinal construction method for road transformation in alpine and valley areas
一种高山峡谷区道路改造纵向施工方法
WEN YANPING (Autor:in) / WU HAO (Autor:in) / PANG SANYU (Autor:in)
24.11.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Road construction in death valley
Engineering Index Backfile | 1936
|Geomechanical model of an alpine valley
Springer Verlag | 1979
|Annual opening and closure of Alpine valley
IuD Bahn | 2007
|Dismantling structure and dismantling method of alpine and valley ultrahigh tower
Europäisches Patentamt | 2023
|The Arc development : an Alpine Valley scheme (part 2)
Tema Archiv | 1972
|