Foundation treatment method for newly-added sluice pier of existing sluice and newly-added sluice pier
The method comprises the steps that a through hole is formed in an existing water gate bottom plate, the through hole penetrates through the existing water gate bottom plate, an existing cushion layer and a natural foundation, a reinforcement cage is placed in the through hole, a newly-added cast-in-place pile is manufactured by pouring concrete, and a part of the reinforcement cage is reserved at the top of the newly-added cast-in-place pile; the diameter of the newly-added cast-in-place pile is smaller than that of the through hole, and the newly-added cast-in-place pile is higher than the existing water gate bottom plate by a certain height, a formwork is erected at the top, higher than the existing water gate bottom plate, of the newly-added cast-in-place pile, the bottom of the formwork and the existing water gate bottom plate are spaced by a certain distance, a supporting frame is arranged at the bottom of the formwork, layered pouring is conducted on the formwork, and a newly-added gate pier is formed. The newly-added sluice piers are arranged on the existing sluice bottom plate, a single-hole sluice is changed into a double-hole sluice, the purposes of reducing the width of a sluice chamber and accordingly reducing the width of the sluice are achieved, deformation of the sluice and the sluice chamber can be fully coordinated, and opening and closing of the two sides of the sluice can be synchronous and smoother.
本发明一种既有水闸新增闸墩地基处理方法及新增闸墩,包括在既有水闸底板开通孔,通孔穿过既有水闸底板、既有垫层和天然地基,在通孔内放置钢筋笼且通过浇筑混凝土制成新增灌注桩,新增灌注桩顶部保留一部分钢筋笼,新增灌注桩的直径小于通孔的直径且高出既有水闸底板一定高度,在新增灌注桩高出既有水闸底板顶部架设模板,模板底部与既有水闸底板间隔一定距离,在模板底部设置支撑架,对模板上采用分层浇筑,形成新增闸墩。本发明在既有水闸底板上设置新增闸墩,使单孔水闸变为双孔水闸,达到减少闸室宽度、从而减小闸门宽度的目的,使闸门自身的变形与闸室能够充分协调,也能使闸门两侧启闭同步更加顺畅。
Foundation treatment method for newly-added sluice pier of existing sluice and newly-added sluice pier
The method comprises the steps that a through hole is formed in an existing water gate bottom plate, the through hole penetrates through the existing water gate bottom plate, an existing cushion layer and a natural foundation, a reinforcement cage is placed in the through hole, a newly-added cast-in-place pile is manufactured by pouring concrete, and a part of the reinforcement cage is reserved at the top of the newly-added cast-in-place pile; the diameter of the newly-added cast-in-place pile is smaller than that of the through hole, and the newly-added cast-in-place pile is higher than the existing water gate bottom plate by a certain height, a formwork is erected at the top, higher than the existing water gate bottom plate, of the newly-added cast-in-place pile, the bottom of the formwork and the existing water gate bottom plate are spaced by a certain distance, a supporting frame is arranged at the bottom of the formwork, layered pouring is conducted on the formwork, and a newly-added gate pier is formed. The newly-added sluice piers are arranged on the existing sluice bottom plate, a single-hole sluice is changed into a double-hole sluice, the purposes of reducing the width of a sluice chamber and accordingly reducing the width of the sluice are achieved, deformation of the sluice and the sluice chamber can be fully coordinated, and opening and closing of the two sides of the sluice can be synchronous and smoother.
本发明一种既有水闸新增闸墩地基处理方法及新增闸墩,包括在既有水闸底板开通孔,通孔穿过既有水闸底板、既有垫层和天然地基,在通孔内放置钢筋笼且通过浇筑混凝土制成新增灌注桩,新增灌注桩顶部保留一部分钢筋笼,新增灌注桩的直径小于通孔的直径且高出既有水闸底板一定高度,在新增灌注桩高出既有水闸底板顶部架设模板,模板底部与既有水闸底板间隔一定距离,在模板底部设置支撑架,对模板上采用分层浇筑,形成新增闸墩。本发明在既有水闸底板上设置新增闸墩,使单孔水闸变为双孔水闸,达到减少闸室宽度、从而减小闸门宽度的目的,使闸门自身的变形与闸室能够充分协调,也能使闸门两侧启闭同步更加顺畅。
Foundation treatment method for newly-added sluice pier of existing sluice and newly-added sluice pier
一种既有水闸新增闸墩地基处理方法及新增闸墩
PENG LIANGQUAN (Autor:in) / PENG SHAOCAI (Autor:in) / MOU CHUNXIA (Autor:in) / ZENG WEN (Autor:in) / ZENG FANQIN (Autor:in) / MA XIAOJUN (Autor:in) / LI MIN (Autor:in) / ZHENG JIANKUN (Autor:in) / SONG RUIHU (Autor:in) / ZHAO ZEHU (Autor:in)
24.11.2023
Patent
Elektronische Ressource
Chinesisch
Sluice maintenance bridge capable of reasonably utilizing upper space of sluice pier
Europäisches Patentamt | 2024
|Sluice pier-joint bent formwork erecting combined structure
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2023
|Concrete sluice gate pier structure and construction method thereof
Europäisches Patentamt | 2021
|