Water pool full water test construction process
The invention provides a water pool full water test construction technology, and belongs to the technical field of full water tests, and the technology comprises the following steps: S1, test preparation: cleaning the interior of a pool, temporarily plugging a reserved hole, a pre-embedded sleeve opening and a water inlet and outlet, and keeping the plugging tight; s2, a test method: plugging the reserved hole and the pre-embedded sleeve in advance before a structure full water test, cleaning impurities in a pool body, and performing construction according to the following steps; according to the anti-seepage standard, after water is injected to the designed water level, the water seepage amount does not exceed 1/1000 24 hours, and water does not leak from a construction joint and a post-cast strip; s4, experiment drainage, wherein water is pumped through a water pump; s5, emergency drainage: when an emergency occurs, emergency measures are started in time, and water is drained in time; s6, taking water seepage treatment measures; and S7, foundation pit backfilling. The device can achieve the effects of emergency drainage, full experiment and long-time detection.
本发明提供了一种水池满水试验施工工艺,属于满水试验技术领域,其工艺如下:S1试验准备:将池内清理干净,临时封堵预留孔洞及预埋套管口及进出水口,封堵保持严密;S2试验方法:构筑物满水试验前应提前对预留孔洞、预埋套管进行封堵,清理干净池体内杂物,并按照以下步骤进行施工;S3抗渗标准:抗渗标准定为注水至设计水位后,24小时渗水量不超过1/1000,施工缝、后浇带不漏水;S4实验排水:排水采用水泵抽水;S5应急排水:出现紧急情况时,及时启动应急措施,及时将水排出;S6渗水处理措施;S7基坑回填。本发明能够达到可应急排水、充分实验和长时间检测的效果。
Water pool full water test construction process
The invention provides a water pool full water test construction technology, and belongs to the technical field of full water tests, and the technology comprises the following steps: S1, test preparation: cleaning the interior of a pool, temporarily plugging a reserved hole, a pre-embedded sleeve opening and a water inlet and outlet, and keeping the plugging tight; s2, a test method: plugging the reserved hole and the pre-embedded sleeve in advance before a structure full water test, cleaning impurities in a pool body, and performing construction according to the following steps; according to the anti-seepage standard, after water is injected to the designed water level, the water seepage amount does not exceed 1/1000 24 hours, and water does not leak from a construction joint and a post-cast strip; s4, experiment drainage, wherein water is pumped through a water pump; s5, emergency drainage: when an emergency occurs, emergency measures are started in time, and water is drained in time; s6, taking water seepage treatment measures; and S7, foundation pit backfilling. The device can achieve the effects of emergency drainage, full experiment and long-time detection.
本发明提供了一种水池满水试验施工工艺,属于满水试验技术领域,其工艺如下:S1试验准备:将池内清理干净,临时封堵预留孔洞及预埋套管口及进出水口,封堵保持严密;S2试验方法:构筑物满水试验前应提前对预留孔洞、预埋套管进行封堵,清理干净池体内杂物,并按照以下步骤进行施工;S3抗渗标准:抗渗标准定为注水至设计水位后,24小时渗水量不超过1/1000,施工缝、后浇带不漏水;S4实验排水:排水采用水泵抽水;S5应急排水:出现紧急情况时,及时启动应急措施,及时将水排出;S6渗水处理措施;S7基坑回填。本发明能够达到可应急排水、充分实验和长时间检测的效果。
Water pool full water test construction process
一种水池满水试验施工工艺
ZHAO ZIJUN (Autor:in) / JIANG WEI (Autor:in) / CHEN TIANCHI (Autor:in) / XIAO YANPING (Autor:in) / ZHOU GANG (Autor:in) / ZHENG YI (Autor:in) / XIE LIWEN (Autor:in) / LI LUN (Autor:in) / WANG YUYANG (Autor:in) / CHEN JUNLI (Autor:in)
24.11.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
/
E04G
SCAFFOLDING
,
Baugerüste
/
G01F
Messen des Volumens, des Durchflussvolumens, des Massendurchflusses oder des Füllstandes
,
MEASURING VOLUME, VOLUME FLOW, MASS FLOW, OR LIQUID LEVEL
/
G01N
Untersuchen oder Analysieren von Stoffen durch Bestimmen ihrer chemischen oder physikalischen Eigenschaften
,
INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
Plugging device for reserved hole in full water test of pool
Europäisches Patentamt | 2023
|Anti-drowning intelligent full-pool running water swimming pool equipment
Europäisches Patentamt | 2022
|Water supply pool water pipe assembly for construction
Europäisches Patentamt | 2023
|