Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pay-off tool for wall-attached construction of tower crane
The invention relates to a paying-off tool for tower crane wall attaching construction, and belongs to the technical field of building construction. The device comprises a moving plate, a rotating plate, a mounting block and laser generators, the moving plate is used for being connected with a wall or a tower crane, the rotating plate is rotationally arranged on the moving plate, the mounting block is arranged on the side, away from the moving plate, of the rotating plate, and four reserved holes allowing the laser generators to be placed in are formed in the side, away from the moving plate, of the mounting block. And the distance between the four preformed holes corresponds to the outer covering size of the interface of the wall-attached rod. The problem that interference is possibly generated between the tower crane and a scaffold and a building main body structure during wall attaching construction of the tower crane can be solved.
本申请涉及一种用于塔吊附墙施工的放线工具,属于建筑施工技术的领域。其包括移动板、转动板、安装块以及激光发生器,所述移动板用于与墙体或塔吊相连接,所述转动板转动设置在移动板上,所述安装块设置在转动板背离移动板的一侧,所述安装块背离移动板的一侧开设有四个供激光发生器放入的预留孔,四个所述预留孔的间距与附墙杆的界面外包尺寸相对应。本申请能够改善塔机附墙施工时可能与脚手架、建筑主体结构之间产生干涉的问题。
Pay-off tool for wall-attached construction of tower crane
The invention relates to a paying-off tool for tower crane wall attaching construction, and belongs to the technical field of building construction. The device comprises a moving plate, a rotating plate, a mounting block and laser generators, the moving plate is used for being connected with a wall or a tower crane, the rotating plate is rotationally arranged on the moving plate, the mounting block is arranged on the side, away from the moving plate, of the rotating plate, and four reserved holes allowing the laser generators to be placed in are formed in the side, away from the moving plate, of the mounting block. And the distance between the four preformed holes corresponds to the outer covering size of the interface of the wall-attached rod. The problem that interference is possibly generated between the tower crane and a scaffold and a building main body structure during wall attaching construction of the tower crane can be solved.
本申请涉及一种用于塔吊附墙施工的放线工具,属于建筑施工技术的领域。其包括移动板、转动板、安装块以及激光发生器,所述移动板用于与墙体或塔吊相连接,所述转动板转动设置在移动板上,所述安装块设置在转动板背离移动板的一侧,所述安装块背离移动板的一侧开设有四个供激光发生器放入的预留孔,四个所述预留孔的间距与附墙杆的界面外包尺寸相对应。本申请能够改善塔机附墙施工时可能与脚手架、建筑主体结构之间产生干涉的问题。
Pay-off tool for wall-attached construction of tower crane
一种用于塔吊附墙施工的放线工具
WANG ZHI (Autor:in) / WANG XIANGZHE (Autor:in) / ZHANG YUHUANG (Autor:in) / ZHU ZHONGHUAI (Autor:in)
24.11.2023
Patent
Elektronische Ressource
Chinesisch
Wall-attached structure of tower crane and construction method of wall-attached structure
Europäisches Patentamt | 2024
|Tower crane wall-attached mounting operation platform
Europäisches Patentamt | 2020
|Tower crane retaining wall construction device and method
Europäisches Patentamt | 2021
|Tower crane foundation structure of construction-free tower crane pile
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|