Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Viaduct pier column steel bar binding structure
The invention belongs to the technical field of steel bar binding, and particularly relates to a viaduct pier column steel bar binding structure which comprises a bearing platform, a pile foundation is fixedly arranged on the bearing platform, a bridge body is fixedly arranged on the pile foundation, a steel bar cage is poured in the bridge body, and vertical bars and annular bars are arranged in the steel bar cage. The multiple vertical ribs and the multiple annular ribs are arranged in a linear structure at equal intervals, movable vehicles are arranged at the left end and the right end of the pile foundation, supports are fixedly arranged on the top faces of the movable vehicles, sliding blocks are slidably connected to the supports, and a grabbing mechanism is arranged on the sliding block at the front end. A strapping assembly is arranged on the sliding block located at the rear end, a rack is fixedly arranged on the outer wall of the support, a gear is arranged on the outer side of the sliding block, and the inner end of the gear is connected with the outer side of the sliding block in a meshed mode. Rapid binding of the viaduct pier column steel bars is achieved, time and labor are saved, the binding efficiency is improved, the labor use cost is reduced, the safety of binding of the viaduct pier column steel bars is improved, and construction use is facilitated.
本发明属于钢筋绑扎技术领域,特别是一种高架桥墩柱钢筋绑扎结构,包括承台,所述承台上固设有桩基础,所述桩基础上固设有桥梁主体,所述桥梁主体内部浇筑有钢筋笼,所述钢筋笼内部分别设有立筋和环筋,所述立筋和环筋均呈线性等间距结构设有多个,所述桩基础左右两端均设有活动车,所述活动车顶面固设有支架,所述支架上滑动连接有滑块位于前端的所述滑块上设有抓取机构,位于后端的所述滑块上设有捆扎组件所述支架外壁固设有齿条,所述滑块外侧设有齿轮,所述齿轮内端与滑块外侧啮合连接。实现了高架桥墩柱钢筋的快速绑扎,省时省力提高了绑扎效率,降低了人力使用成本,提高了高架桥墩柱钢筋绑扎的安全性,方便了施工使用。
Viaduct pier column steel bar binding structure
The invention belongs to the technical field of steel bar binding, and particularly relates to a viaduct pier column steel bar binding structure which comprises a bearing platform, a pile foundation is fixedly arranged on the bearing platform, a bridge body is fixedly arranged on the pile foundation, a steel bar cage is poured in the bridge body, and vertical bars and annular bars are arranged in the steel bar cage. The multiple vertical ribs and the multiple annular ribs are arranged in a linear structure at equal intervals, movable vehicles are arranged at the left end and the right end of the pile foundation, supports are fixedly arranged on the top faces of the movable vehicles, sliding blocks are slidably connected to the supports, and a grabbing mechanism is arranged on the sliding block at the front end. A strapping assembly is arranged on the sliding block located at the rear end, a rack is fixedly arranged on the outer wall of the support, a gear is arranged on the outer side of the sliding block, and the inner end of the gear is connected with the outer side of the sliding block in a meshed mode. Rapid binding of the viaduct pier column steel bars is achieved, time and labor are saved, the binding efficiency is improved, the labor use cost is reduced, the safety of binding of the viaduct pier column steel bars is improved, and construction use is facilitated.
本发明属于钢筋绑扎技术领域,特别是一种高架桥墩柱钢筋绑扎结构,包括承台,所述承台上固设有桩基础,所述桩基础上固设有桥梁主体,所述桥梁主体内部浇筑有钢筋笼,所述钢筋笼内部分别设有立筋和环筋,所述立筋和环筋均呈线性等间距结构设有多个,所述桩基础左右两端均设有活动车,所述活动车顶面固设有支架,所述支架上滑动连接有滑块位于前端的所述滑块上设有抓取机构,位于后端的所述滑块上设有捆扎组件所述支架外壁固设有齿条,所述滑块外侧设有齿轮,所述齿轮内端与滑块外侧啮合连接。实现了高架桥墩柱钢筋的快速绑扎,省时省力提高了绑扎效率,降低了人力使用成本,提高了高架桥墩柱钢筋绑扎的安全性,方便了施工使用。
Viaduct pier column steel bar binding structure
一种高架桥墩柱钢筋绑扎结构
HUANG QIN (Autor:in) / SHI HAIDONG (Autor:in) / FAN WENZHONG (Autor:in) / DENG JIAYE (Autor:in) / LU WEI (Autor:in)
28.11.2023
Patent
Elektronische Ressource
Chinesisch
Anti-overturning reinforcing device for single-column pier viaduct
Europäisches Patentamt | 2020
|Makatote Viaduct - Underpinning Pier 7
British Library Online Contents | 2007