Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Detachable stepping steel rail matched with TBM (Tunnel Boring Machine) and construction method of detachable stepping steel rail
The invention discloses a TBM rear matching detachable stepping steel rail which comprises a first steel rail, a plurality of steel rail supporting structures and side connecting assemblies, and the side connecting assemblies and the steel rail supporting structures are detachably connected. The steel rail supporting structure comprises a first sleeper assembly connected together, and the first sleeper assembly comprises a first upper sleeper, a first lower sleeper and a first supporting column connecting the first upper sleeper and a first lower sleeper together. The first upper sleepers of the two first sleeper assemblies are detachably connected through first connecting assemblies, and the first lower sleepers of the two first sleeper assemblies are detachably connected through first connecting assemblies. The steel rail supporting structure is detachably connected, the side connecting assemblies and the first sleeper assemblies are detachably connected, and disassembly is easy and convenient. In addition, the length of the stepping steel rail is two times that of the rear matched trolley, when the rear matched trolley runs to the foremost end, part of the stepping steel rail behind the trolley can be detached, the detached part is installed on the front side of the trolley again, materials are saved, and cost is reduced.
本发明公开了一种TBM后配套用拆卸式步进钢轨,包括第一钢轨、多个钢轨支撑结构和侧连接组件,侧连接组件和钢轨支撑结构为拆卸式连接;钢轨支撑结构包括连接在一起的第一轨枕组件,第一轨枕组件包括第一上轨枕、第一上轨枕和将所述第一上轨枕、第一下轨枕连接在一起的第一支撑柱;两第一轨枕组件的第一上轨枕之间、两第一轨枕组件的第一下轨枕之间通过第一连接组件拆卸式连接。本发明中的钢轨支撑结构为拆卸式连接,侧连接组件和第一轨枕组件拆卸式连接,拆卸简单方便。另外,步进钢轨的长度为后配套台车的2倍,当后配套台车运行至最前端时可将台车后面的部分步进钢轨拆除,并将拆除部分再次安装在台车的前侧,节约材料,降低成本。
Detachable stepping steel rail matched with TBM (Tunnel Boring Machine) and construction method of detachable stepping steel rail
The invention discloses a TBM rear matching detachable stepping steel rail which comprises a first steel rail, a plurality of steel rail supporting structures and side connecting assemblies, and the side connecting assemblies and the steel rail supporting structures are detachably connected. The steel rail supporting structure comprises a first sleeper assembly connected together, and the first sleeper assembly comprises a first upper sleeper, a first lower sleeper and a first supporting column connecting the first upper sleeper and a first lower sleeper together. The first upper sleepers of the two first sleeper assemblies are detachably connected through first connecting assemblies, and the first lower sleepers of the two first sleeper assemblies are detachably connected through first connecting assemblies. The steel rail supporting structure is detachably connected, the side connecting assemblies and the first sleeper assemblies are detachably connected, and disassembly is easy and convenient. In addition, the length of the stepping steel rail is two times that of the rear matched trolley, when the rear matched trolley runs to the foremost end, part of the stepping steel rail behind the trolley can be detached, the detached part is installed on the front side of the trolley again, materials are saved, and cost is reduced.
本发明公开了一种TBM后配套用拆卸式步进钢轨,包括第一钢轨、多个钢轨支撑结构和侧连接组件,侧连接组件和钢轨支撑结构为拆卸式连接;钢轨支撑结构包括连接在一起的第一轨枕组件,第一轨枕组件包括第一上轨枕、第一上轨枕和将所述第一上轨枕、第一下轨枕连接在一起的第一支撑柱;两第一轨枕组件的第一上轨枕之间、两第一轨枕组件的第一下轨枕之间通过第一连接组件拆卸式连接。本发明中的钢轨支撑结构为拆卸式连接,侧连接组件和第一轨枕组件拆卸式连接,拆卸简单方便。另外,步进钢轨的长度为后配套台车的2倍,当后配套台车运行至最前端时可将台车后面的部分步进钢轨拆除,并将拆除部分再次安装在台车的前侧,节约材料,降低成本。
Detachable stepping steel rail matched with TBM (Tunnel Boring Machine) and construction method of detachable stepping steel rail
TBM后配套用拆卸式步进钢轨及其施工方法
YANG JIHUA (Autor:in) / HE JINGJIAN (Autor:in) / YANG JINLIN (Autor:in) / WANG ZHIQIANG (Autor:in) / WEI JIANPENG (Autor:in) / ZHANG DANGLI (Autor:in)
01.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Rail-spanning stepping type ballast excavating machine
Europäisches Patentamt | 2015
|