Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Assembled building structure convenient to construct
The invention relates to the technical field of building construction, and discloses a convenient-to-construct assembled building structure which comprises a building foundation, a first groove is formed in one side of the building foundation, a supporting column is movably connected to the interior of the first groove, a sixth groove is formed in one side of the supporting column, and a third fixing plate is movably connected to one side of the sixth groove. A first fixing rod is fixedly connected to one side of the supporting column, a fixing block is movably connected to one side of the first fixing rod, a first fixing plate is fixedly connected to one side of the fixing block, and a top plate is movably connected to one side of the first fixing plate. And a dismounting mechanism is arranged outside the first fixing plate. By means of the technical scheme, the problems that in the prior art, when a building structure is spliced, the splicing process is generally troublesome, and when a building needs to be dismounted, the process is tedious are solved.
本发明涉及建筑施工技术领域,且公开了一种便于施工的拼装式建筑结构,包括建筑地基,建筑地基的一侧开设有一号凹槽,一号凹槽的内部活动连接有支撑柱,支撑柱的一侧开设有六号凹槽,六号凹槽的一侧活动连接有三号固定板,三号固定板的一侧固定连接有四号固定板,四号固定板的外部设置有固定机构,支撑柱的一侧固定连接有一号固定杆,一号固定杆的一侧活动连接有固定块,固定块的一侧固定连接有一号固定板,一号固定板的一侧活动连接有顶板,一号固定板的外部设置有拆卸机构,通过上述技术方案,解决了现有技术建筑结构进行拼装的时候,拼装的过程一般较为麻烦,当建筑需要拆卸的时候,其过程比较的繁琐的问题。
Assembled building structure convenient to construct
The invention relates to the technical field of building construction, and discloses a convenient-to-construct assembled building structure which comprises a building foundation, a first groove is formed in one side of the building foundation, a supporting column is movably connected to the interior of the first groove, a sixth groove is formed in one side of the supporting column, and a third fixing plate is movably connected to one side of the sixth groove. A first fixing rod is fixedly connected to one side of the supporting column, a fixing block is movably connected to one side of the first fixing rod, a first fixing plate is fixedly connected to one side of the fixing block, and a top plate is movably connected to one side of the first fixing plate. And a dismounting mechanism is arranged outside the first fixing plate. By means of the technical scheme, the problems that in the prior art, when a building structure is spliced, the splicing process is generally troublesome, and when a building needs to be dismounted, the process is tedious are solved.
本发明涉及建筑施工技术领域,且公开了一种便于施工的拼装式建筑结构,包括建筑地基,建筑地基的一侧开设有一号凹槽,一号凹槽的内部活动连接有支撑柱,支撑柱的一侧开设有六号凹槽,六号凹槽的一侧活动连接有三号固定板,三号固定板的一侧固定连接有四号固定板,四号固定板的外部设置有固定机构,支撑柱的一侧固定连接有一号固定杆,一号固定杆的一侧活动连接有固定块,固定块的一侧固定连接有一号固定板,一号固定板的一侧活动连接有顶板,一号固定板的外部设置有拆卸机构,通过上述技术方案,解决了现有技术建筑结构进行拼装的时候,拼装的过程一般较为麻烦,当建筑需要拆卸的时候,其过程比较的繁琐的问题。
Assembled building structure convenient to construct
一种便于施工的拼装式建筑结构
JIA YAN (Autor:in) / LIU JIE (Autor:in) / YANG DONGTAO (Autor:in)
01.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Building partition wall structure convenient to construct and construction method
Europäisches Patentamt | 2022
|Fabricated building support frame convenient to construct with stable structure
Europäisches Patentamt | 2020
|