Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Full-prefabricated assembly type steel pipe constraint frame joint
The invention discloses a full-prefabricated assembly type steel pipe constraint frame node, and relates to the field of steel pipe constraint frame nodes, the full-prefabricated assembly type steel pipe constraint frame node comprises a main steel beam, the surface of the main steel beam is provided with a plurality of first connecting ports, first L-shaped connecting pieces are installed in the first connecting ports, and the opposite faces of the two first L-shaped connecting pieces are provided with the same front end beam; a first triangular inclined strut is installed on the side, away from the front end beam, of each first L-shaped connecting piece. The first threaded hole of the rear end beam is aligned with the receding hole of the rear end beam and the receding hole of the front end beam, the splice plate is arranged on the side, away from the rear end beam, of the front end beam, the second threaded hole of the splice plate is aligned with the receding hole, and the rear end beam is fixed to the front end beam through the first rigid bolt; and second rigid bolts are screwed into third threaded holes, and the rear end beam is reinforced and mounted through fourth threaded holes, so that the rear end beam is mounted on the main steel beam, and the construction process is simpler and quicker.
本发明公开了一种全预制装配式钢管约束框架节点,涉及钢管约束框架节点领域,包括主钢梁,所述主钢梁的表面开设有若干第一连接口,所述第一连接口内均安装有第一L形连接件,两个所述第一L形连接件的相对面安装有同一个前端梁,所述第一L形连接件远离前端梁的一侧均安装有第一三角形斜撑。本发明通过将后端梁的第一螺纹孔与后端梁与前端梁的避让孔对齐,将拼接板置于前端梁远离后端梁的一侧并将其第二螺纹孔与避让孔对齐,通过第一刚性螺栓将后端梁固定在前端梁上,再通过将第二刚性螺栓拧入第三螺纹孔并通过第四螺纹孔对后端梁进行加固安装,从而使后端梁安装在主钢梁上,使施工过程更加简单快速。
Full-prefabricated assembly type steel pipe constraint frame joint
The invention discloses a full-prefabricated assembly type steel pipe constraint frame node, and relates to the field of steel pipe constraint frame nodes, the full-prefabricated assembly type steel pipe constraint frame node comprises a main steel beam, the surface of the main steel beam is provided with a plurality of first connecting ports, first L-shaped connecting pieces are installed in the first connecting ports, and the opposite faces of the two first L-shaped connecting pieces are provided with the same front end beam; a first triangular inclined strut is installed on the side, away from the front end beam, of each first L-shaped connecting piece. The first threaded hole of the rear end beam is aligned with the receding hole of the rear end beam and the receding hole of the front end beam, the splice plate is arranged on the side, away from the rear end beam, of the front end beam, the second threaded hole of the splice plate is aligned with the receding hole, and the rear end beam is fixed to the front end beam through the first rigid bolt; and second rigid bolts are screwed into third threaded holes, and the rear end beam is reinforced and mounted through fourth threaded holes, so that the rear end beam is mounted on the main steel beam, and the construction process is simpler and quicker.
本发明公开了一种全预制装配式钢管约束框架节点,涉及钢管约束框架节点领域,包括主钢梁,所述主钢梁的表面开设有若干第一连接口,所述第一连接口内均安装有第一L形连接件,两个所述第一L形连接件的相对面安装有同一个前端梁,所述第一L形连接件远离前端梁的一侧均安装有第一三角形斜撑。本发明通过将后端梁的第一螺纹孔与后端梁与前端梁的避让孔对齐,将拼接板置于前端梁远离后端梁的一侧并将其第二螺纹孔与避让孔对齐,通过第一刚性螺栓将后端梁固定在前端梁上,再通过将第二刚性螺栓拧入第三螺纹孔并通过第四螺纹孔对后端梁进行加固安装,从而使后端梁安装在主钢梁上,使施工过程更加简单快速。
Full-prefabricated assembly type steel pipe constraint frame joint
一种全预制装配式钢管约束框架节点
MA KANG (Autor:in) / WANG CHUNYUN (Autor:in) / YU HAIFENG (Autor:in) / CAO KANGJIA (Autor:in) / ZHANG MINGQIAN (Autor:in) / LI YONG (Autor:in) / WU RUOYANG (Autor:in) / WANG ZHUO (Autor:in) / WEI JIAQI (Autor:in) / JIN TIANJIAO (Autor:in)
01.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Steel pipe column constraint assembly type prefabricated shear wall structure
Europäisches Patentamt | 2023
|Steel pipe column constraint assembly type prefabricated shear wall structure
Europäisches Patentamt | 2023
|Prefabricated assembly type electric power pipe gallery frame
Europäisches Patentamt | 2024
|BEAM-GIRDER JOINT FOR PREFABRICATED STEEL FRAME ASSEMBLY
Europäisches Patentamt | 2019
|Europäisches Patentamt | 2022
|