Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pipeline elbow anchor block split pouring construction method and device
The invention discloses a pipeline elbow anchor block split pouring construction method and device, and belongs to the technical field of pipeline relocation construction.The pipeline elbow anchor block split pouring construction device comprises a base, and a first vertical reinforcing steel bar, a second vertical reinforcing steel bar and a third vertical reinforcing steel bar are fixedly connected to the base; a first transverse reinforcing steel bar is fixedly connected between the first vertical reinforcing steel bar and the second vertical reinforcing steel bar, a second transverse reinforcing steel bar is fixedly connected between the second vertical reinforcing steel bar and the third vertical reinforcing steel bar, an inclined reinforcing steel bar is fixedly connected between the first vertical reinforcing steel bar and the third vertical reinforcing steel bar, and an elbow is arranged on the base. A pipeline elbow anchor block split pouring construction method comprises the following steps that an anchor block foundation pit in a corresponding area below an elbow is excavated; before the pipeline is laid, anchor block foundation pit concrete is poured; a plurality of steel bars are embedded to form an elbow fixing and supporting system. The elbow has the effect that the water pressure bearing capacity of the elbow is improved.
本申请公开了一种管道弯头镇墩分体浇筑施工方法及施工装置,属于管道改迁施工技术领域,一种管道弯头镇墩分体浇筑施工装置,包括基座,基座上固定连接有第一竖直钢筋、第二竖直钢筋以及第三竖直钢筋,第一竖直钢筋与第二竖直钢筋之间固定连接有第一横向钢筋,第二竖直钢筋与第三竖直钢筋之间固定连接有第二横向钢筋,第一竖直钢筋与第三竖直钢筋之间固定连接有倾斜钢筋,基座上设置有弯头。一种管道弯头镇墩分体浇筑施工方法,包括以下步骤:开挖弯头下方对应区域的镇墩基坑;在管道敷设之前,浇筑镇墩基坑混凝土;预埋多个钢筋组成弯头固定支撑体系。本申请具有提高弯头承受水压能力的效果。
Pipeline elbow anchor block split pouring construction method and device
The invention discloses a pipeline elbow anchor block split pouring construction method and device, and belongs to the technical field of pipeline relocation construction.The pipeline elbow anchor block split pouring construction device comprises a base, and a first vertical reinforcing steel bar, a second vertical reinforcing steel bar and a third vertical reinforcing steel bar are fixedly connected to the base; a first transverse reinforcing steel bar is fixedly connected between the first vertical reinforcing steel bar and the second vertical reinforcing steel bar, a second transverse reinforcing steel bar is fixedly connected between the second vertical reinforcing steel bar and the third vertical reinforcing steel bar, an inclined reinforcing steel bar is fixedly connected between the first vertical reinforcing steel bar and the third vertical reinforcing steel bar, and an elbow is arranged on the base. A pipeline elbow anchor block split pouring construction method comprises the following steps that an anchor block foundation pit in a corresponding area below an elbow is excavated; before the pipeline is laid, anchor block foundation pit concrete is poured; a plurality of steel bars are embedded to form an elbow fixing and supporting system. The elbow has the effect that the water pressure bearing capacity of the elbow is improved.
本申请公开了一种管道弯头镇墩分体浇筑施工方法及施工装置,属于管道改迁施工技术领域,一种管道弯头镇墩分体浇筑施工装置,包括基座,基座上固定连接有第一竖直钢筋、第二竖直钢筋以及第三竖直钢筋,第一竖直钢筋与第二竖直钢筋之间固定连接有第一横向钢筋,第二竖直钢筋与第三竖直钢筋之间固定连接有第二横向钢筋,第一竖直钢筋与第三竖直钢筋之间固定连接有倾斜钢筋,基座上设置有弯头。一种管道弯头镇墩分体浇筑施工方法,包括以下步骤:开挖弯头下方对应区域的镇墩基坑;在管道敷设之前,浇筑镇墩基坑混凝土;预埋多个钢筋组成弯头固定支撑体系。本申请具有提高弯头承受水压能力的效果。
Pipeline elbow anchor block split pouring construction method and device
一种管道弯头镇墩分体浇筑施工方法及施工装置
XU HUI (Autor:in) / BIAN YONG (Autor:in) / WANG CONGHUI (Autor:in) / SU CHENG (Autor:in) / HUO XIANGKUI (Autor:in) / XING SHENGBAO (Autor:in)
01.12.2023
Patent
Elektronische Ressource
Chinesisch
Concrete pouring device for underground pipeline construction
Europäisches Patentamt | 2024
|Split type pouring construction method for anchorage foundation
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|