Construction method pile profile steel construction perpendicularity control equipment
The invention discloses construction method pile profile steel construction perpendicularity control equipment which comprises a fixed base fixed to the construction position of a construction method pile and a control body fixed to the upper portion of the fixed base, the fixed base is provided with a through hole, and the control body is provided with a penetrating hole parallel to the through hole. At least one pair of positioning pulleys is arranged on a first pair of opposite surfaces of the inner wall of the through hole, at least one pair of leading-in pulleys is arranged on a second pair of opposite surfaces of the inner wall of the through hole, the fixed base is provided with screw holes used for being connected with the control main body and is connected through leveling bolts, and the leveling bolts are used for adjusting the levelness of the control main body so that the axis direction of the through hole can be the vertical direction; the penetrating holes are used for entering of profile steel. The positioning pulleys and the guide-in pulleys are arranged in the penetrating holes to guide in the profile steel, the stability of the profile steel in the entering process is improved, external interference is reduced, the levelness of the control body is adjusted through the leveling bolts, vertical insertion of the profile steel is guaranteed, and the high efficiency and accuracy of construction are improved.
本发明公开了一种工法桩型钢施工垂直度控制设备,包括固定在工法桩施工位置的固定底座以及固定在固定底座上部的控制主体,固定底座为具有通孔的固定底座,控制主体设置有与通孔平行的穿孔,穿孔的内壁的第一对对面设置有至少一对定位滑轮,第二对对面设置有至少一对导入滑轮,固定底座设置有用于连接的控制主体的螺孔并通过调平螺栓连接,调平螺栓用于调整控制主体的水平度,实现穿孔的轴线方向为竖直方向,其中,穿孔用于型钢的进入。通过在穿孔设置定位滑轮和导入滑轮导入型钢,提高了型钢在进入过程的稳定性,减少了外界的干扰,通过采用调平螺栓调整控制主体的水平度,保证型钢垂直插入,提高了施工的高效性和精准性。
Construction method pile profile steel construction perpendicularity control equipment
The invention discloses construction method pile profile steel construction perpendicularity control equipment which comprises a fixed base fixed to the construction position of a construction method pile and a control body fixed to the upper portion of the fixed base, the fixed base is provided with a through hole, and the control body is provided with a penetrating hole parallel to the through hole. At least one pair of positioning pulleys is arranged on a first pair of opposite surfaces of the inner wall of the through hole, at least one pair of leading-in pulleys is arranged on a second pair of opposite surfaces of the inner wall of the through hole, the fixed base is provided with screw holes used for being connected with the control main body and is connected through leveling bolts, and the leveling bolts are used for adjusting the levelness of the control main body so that the axis direction of the through hole can be the vertical direction; the penetrating holes are used for entering of profile steel. The positioning pulleys and the guide-in pulleys are arranged in the penetrating holes to guide in the profile steel, the stability of the profile steel in the entering process is improved, external interference is reduced, the levelness of the control body is adjusted through the leveling bolts, vertical insertion of the profile steel is guaranteed, and the high efficiency and accuracy of construction are improved.
本发明公开了一种工法桩型钢施工垂直度控制设备,包括固定在工法桩施工位置的固定底座以及固定在固定底座上部的控制主体,固定底座为具有通孔的固定底座,控制主体设置有与通孔平行的穿孔,穿孔的内壁的第一对对面设置有至少一对定位滑轮,第二对对面设置有至少一对导入滑轮,固定底座设置有用于连接的控制主体的螺孔并通过调平螺栓连接,调平螺栓用于调整控制主体的水平度,实现穿孔的轴线方向为竖直方向,其中,穿孔用于型钢的进入。通过在穿孔设置定位滑轮和导入滑轮导入型钢,提高了型钢在进入过程的稳定性,减少了外界的干扰,通过采用调平螺栓调整控制主体的水平度,保证型钢垂直插入,提高了施工的高效性和精准性。
Construction method pile profile steel construction perpendicularity control equipment
一种工法桩型钢施工垂直度控制设备
XIAO YAZHOU (Autor:in) / XU FENG (Autor:in) / GAO YANG (Autor:in) / XIE YANSUO (Autor:in) / QU YUNYAN (Autor:in) / YANG JIANG (Autor:in) / LI XIAOYU (Autor:in) / LIU PENG (Autor:in)
05.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
SMW construction method pile profile steel perpendicularity control device
Europäisches Patentamt | 2023
|Precast pile construction perpendicularity detection method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2021
|Steel pipe pile perpendicularity accurate control device and construction method thereof
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|