Construction method for quickly correcting center point of foundation formwork and adjusting horizontal plane
The invention belongs to the technical field of power transmission and transformation lines, and discloses a construction method for rapidly correcting the center point of a foundation formwork and adjusting the horizontal plane, an outer frame, a tower foundation stand column formwork, square timber, a steel pipe and a euphroe are included, and the construction method comprises the following steps that S1, the bottom end of the tower foundation stand column formwork is connected and fixed through a steel wire rope and the euphroe; an outer frame is arranged on the outer side face of the tower foundation stand column formwork. By accurately correcting the position of the formwork, retracting and releasing the euphroe and adjusting the elevation of the center point and the horizontal plane of the formwork, it is guaranteed that the formwork is aligned with a tower leg, the iron tower installation precision is improved, finally, the construction cost is reduced, the euphroe and the outer frame are low in use cost and can be repeatedly used, and compared with traditional hand angle steel, the construction cost is reduced, and the construction efficiency is improved. The labor and mechanical cost is saved, the construction efficiency is remarkably improved, the formwork stability is improved, the formwork position is accurately corrected, and the construction cost is reduced.
本发明属于输变电线路技术领域,且公开了一种快速校正基础模板中心点及调整水平面的施工方法,包括外架、杆塔基础立柱模板、方木、钢管、紧绳器,包括以下施工方法:S1:首先将杆塔基础立柱模板的底端采用钢丝绳和紧绳器进行连接固定,并在杆塔基础立柱模板的外侧面设置有外架。本发明通过实现了精准校正模板位置,通过紧绳器的收放,调整模板的中心点和水平面高程,保证了模板与杆塔腿的对齐,提高了铁塔安装的精度,最后,它降低了施工成本,紧绳器和外架的使用成本较低且可反复利用,与传统的手角钢相比,节省了人力和机械成本,显著提高施工效率、增加模板稳定性、精准校正模板位置和降低施工成本。
Construction method for quickly correcting center point of foundation formwork and adjusting horizontal plane
The invention belongs to the technical field of power transmission and transformation lines, and discloses a construction method for rapidly correcting the center point of a foundation formwork and adjusting the horizontal plane, an outer frame, a tower foundation stand column formwork, square timber, a steel pipe and a euphroe are included, and the construction method comprises the following steps that S1, the bottom end of the tower foundation stand column formwork is connected and fixed through a steel wire rope and the euphroe; an outer frame is arranged on the outer side face of the tower foundation stand column formwork. By accurately correcting the position of the formwork, retracting and releasing the euphroe and adjusting the elevation of the center point and the horizontal plane of the formwork, it is guaranteed that the formwork is aligned with a tower leg, the iron tower installation precision is improved, finally, the construction cost is reduced, the euphroe and the outer frame are low in use cost and can be repeatedly used, and compared with traditional hand angle steel, the construction cost is reduced, and the construction efficiency is improved. The labor and mechanical cost is saved, the construction efficiency is remarkably improved, the formwork stability is improved, the formwork position is accurately corrected, and the construction cost is reduced.
本发明属于输变电线路技术领域,且公开了一种快速校正基础模板中心点及调整水平面的施工方法,包括外架、杆塔基础立柱模板、方木、钢管、紧绳器,包括以下施工方法:S1:首先将杆塔基础立柱模板的底端采用钢丝绳和紧绳器进行连接固定,并在杆塔基础立柱模板的外侧面设置有外架。本发明通过实现了精准校正模板位置,通过紧绳器的收放,调整模板的中心点和水平面高程,保证了模板与杆塔腿的对齐,提高了铁塔安装的精度,最后,它降低了施工成本,紧绳器和外架的使用成本较低且可反复利用,与传统的手角钢相比,节省了人力和机械成本,显著提高施工效率、增加模板稳定性、精准校正模板位置和降低施工成本。
Construction method for quickly correcting center point of foundation formwork and adjusting horizontal plane
一种快速校正基础模板中心点及调整水平面的施工方法
JU WENLIANG (Autor:in) / WEN ZHONGKANG (Autor:in) / HU BAOQIAN (Autor:in) / CHAI GUODONG (Autor:in) / LEE JONG WON (Autor:in) / LAI JINGXIANG (Autor:in) / JIN WUXIANG (Autor:in) / MOU YANJUN (Autor:in) / SONG SHAOBO (Autor:in)
08.12.2023
Patent
Elektronische Ressource
Chinesisch
FORMWORK, FOUNDATION, AND FOUNDATION CONSTRUCTION METHOD
Europäisches Patentamt | 2024
|FORMWORK, FOUNDATION, AND FOUNDATION CONSTRUCTION METHOD