Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Reverse construction method steel pipe column and tool column self-adjusting type concentric and coaxial butt joint construction method
The invention discloses a reverse building method steel pipe column and tool column self-adjusting type concentric and coaxial butt joint construction method. The method comprises the following steps that S10, a steel pipe column containing area and a tool column containing area are defined in a butt joint site; s20, a plurality of bases are installed in the steel pipe column containing area and the tool column containing area correspondingly according to the lengths of the steel pipe columns and the tool columns, and the heights of the bases are set according to the diameters of the steel pipe columns and the tool columns; s30, a butt joint platform is installed on each base; aligning the placing spaces of the plurality of docking platforms; s40, the steel pipe columns and the tool columns are hoisted to a plurality of butt joint platforms of the steel pipe column containing area and a plurality of butt joint platforms of the tool column containing area correspondingly, the steel pipe columns and the tool columns are placed in containing spaces of the butt joint platforms correspondingly, and the steel pipe columns and the tool columns are in a concentric and coaxial state; and S50, the steel pipe column or the tool column is rotated, and after the steel pipe column and the tool column are aligned, the steel pipe column and the tool column are fixed. According to the technical scheme, the positioning efficiency can be improved while the butt joint precision is guaranteed, and the butt joint time is shortened.
本发明公开一种逆作法钢管柱与工具柱自调式同心同轴对接施工方法,包括以下步骤:S10、在对接场地划定钢管柱放置区和工具柱放置区;S20、根据钢管柱与工具柱的长度分别在钢管柱放置区和工具柱放置区安装多个底座,底座的高度根据钢管柱与工具柱直径设置;S30、在每个底座均安装对接平台;使多个对接平台的放置空间对齐;S40、将钢管柱和工具柱分别吊运至钢管柱放置区的多个对接平台和工具柱放置区的多个对接平台,将钢管柱和工具柱分别放在对接平台的放置空间,使钢管柱与工具柱达到同心同轴的状态;S50、转动钢管柱或工具柱,使钢管柱和工具柱对齐后,将钢管柱和工具柱固定。本发明技术方案能够在保证对接精度的同时,提升定位效率,缩短对接时间。
Reverse construction method steel pipe column and tool column self-adjusting type concentric and coaxial butt joint construction method
The invention discloses a reverse building method steel pipe column and tool column self-adjusting type concentric and coaxial butt joint construction method. The method comprises the following steps that S10, a steel pipe column containing area and a tool column containing area are defined in a butt joint site; s20, a plurality of bases are installed in the steel pipe column containing area and the tool column containing area correspondingly according to the lengths of the steel pipe columns and the tool columns, and the heights of the bases are set according to the diameters of the steel pipe columns and the tool columns; s30, a butt joint platform is installed on each base; aligning the placing spaces of the plurality of docking platforms; s40, the steel pipe columns and the tool columns are hoisted to a plurality of butt joint platforms of the steel pipe column containing area and a plurality of butt joint platforms of the tool column containing area correspondingly, the steel pipe columns and the tool columns are placed in containing spaces of the butt joint platforms correspondingly, and the steel pipe columns and the tool columns are in a concentric and coaxial state; and S50, the steel pipe column or the tool column is rotated, and after the steel pipe column and the tool column are aligned, the steel pipe column and the tool column are fixed. According to the technical scheme, the positioning efficiency can be improved while the butt joint precision is guaranteed, and the butt joint time is shortened.
本发明公开一种逆作法钢管柱与工具柱自调式同心同轴对接施工方法,包括以下步骤:S10、在对接场地划定钢管柱放置区和工具柱放置区;S20、根据钢管柱与工具柱的长度分别在钢管柱放置区和工具柱放置区安装多个底座,底座的高度根据钢管柱与工具柱直径设置;S30、在每个底座均安装对接平台;使多个对接平台的放置空间对齐;S40、将钢管柱和工具柱分别吊运至钢管柱放置区的多个对接平台和工具柱放置区的多个对接平台,将钢管柱和工具柱分别放在对接平台的放置空间,使钢管柱与工具柱达到同心同轴的状态;S50、转动钢管柱或工具柱,使钢管柱和工具柱对齐后,将钢管柱和工具柱固定。本发明技术方案能够在保证对接精度的同时,提升定位效率,缩短对接时间。
Reverse construction method steel pipe column and tool column self-adjusting type concentric and coaxial butt joint construction method
逆作法钢管柱与工具柱自调式同心同轴对接施工方法
WANG TONG (Autor:in) / ZHAO JING (Autor:in) / GUO WENLIN (Autor:in) / LEI BIN (Autor:in) / ZHANG DAAO (Autor:in) / YANG CHEN (Autor:in) / WANG WENWEN (Autor:in) / XU BENDONG (Autor:in) / QIAO JINLONG (Autor:in) / DUAN MAOLIN (Autor:in)
12.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2021
|Concentric and coaxial butt joint platform structure for steel pipe column and tool column
Europäisches Patentamt | 2021
|Steel column butt joint supporting frame and steel column butt joint construction method
Europäisches Patentamt | 2024
|Large-diameter steel pipe column butt joint installation construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|