Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Dredging device for transforming shelter pond
The invention provides a dredging device for transforming a shelter pond, and relates to the field of dredging engineering. The dredging device comprises a workbench, a first hole is formed in the surface of the workbench, a first groove is formed in the side wall of the first hole, and a second hole is formed in the bottom of the first groove; a carrying mechanism is installed on the surface of the workbench and comprises two symmetrically-distributed fixing plates fixedly installed on the surface of the workbench, stand columns are fixedly installed on the surfaces of the fixing plates correspondingly, a first fixing table and a second fixing table are fixedly installed on the tops of the two stand columns correspondingly, and a first driving rod penetrates through the middle of the first fixing table and is rotationally connected with the middle of the second fixing table; first rotating wheels are fixedly connected to the two ends of the first driving rod correspondingly, first winding ropes are arranged on the first rotating wheels correspondingly, and one ends of the first winding ropes are fixed to the first rotating wheels. The method solves the problem that in dredging engineering when the shelter pond is transformed, the dredging engineering is difficult to complete due to the fact that hard rocks always appear in an area.
本发明提供一种用于避风塘改造的疏浚装置,涉及疏浚工程领域。该用于避风塘改造的疏浚装置,包括工作台,所述工作台表面开设有第一孔,第一孔侧壁开设有第一槽,第一槽槽底开设有第二孔;工作台表面安装有搬运机构,搬运机构包括固定安装在工作台表面的两个对称分布的固定板,固定板表面均固定安装有立柱,两个立柱顶部分别固定安装有第一固定台和第二固定台,第一固定台中部贯穿且转动连接有第一驱动杆,所述第一驱动杆两端均固定连接有第一转轮,所述第一转轮上均设置有第一卷绳,所述第一卷绳一端固定在第一转轮上。解决了在对避风塘进行改造时的疏浚工程进行中,由于区域内总是会出现硬质岩石,导致疏浚工程难以完成的问题。
Dredging device for transforming shelter pond
The invention provides a dredging device for transforming a shelter pond, and relates to the field of dredging engineering. The dredging device comprises a workbench, a first hole is formed in the surface of the workbench, a first groove is formed in the side wall of the first hole, and a second hole is formed in the bottom of the first groove; a carrying mechanism is installed on the surface of the workbench and comprises two symmetrically-distributed fixing plates fixedly installed on the surface of the workbench, stand columns are fixedly installed on the surfaces of the fixing plates correspondingly, a first fixing table and a second fixing table are fixedly installed on the tops of the two stand columns correspondingly, and a first driving rod penetrates through the middle of the first fixing table and is rotationally connected with the middle of the second fixing table; first rotating wheels are fixedly connected to the two ends of the first driving rod correspondingly, first winding ropes are arranged on the first rotating wheels correspondingly, and one ends of the first winding ropes are fixed to the first rotating wheels. The method solves the problem that in dredging engineering when the shelter pond is transformed, the dredging engineering is difficult to complete due to the fact that hard rocks always appear in an area.
本发明提供一种用于避风塘改造的疏浚装置,涉及疏浚工程领域。该用于避风塘改造的疏浚装置,包括工作台,所述工作台表面开设有第一孔,第一孔侧壁开设有第一槽,第一槽槽底开设有第二孔;工作台表面安装有搬运机构,搬运机构包括固定安装在工作台表面的两个对称分布的固定板,固定板表面均固定安装有立柱,两个立柱顶部分别固定安装有第一固定台和第二固定台,第一固定台中部贯穿且转动连接有第一驱动杆,所述第一驱动杆两端均固定连接有第一转轮,所述第一转轮上均设置有第一卷绳,所述第一卷绳一端固定在第一转轮上。解决了在对避风塘进行改造时的疏浚工程进行中,由于区域内总是会出现硬质岩石,导致疏浚工程难以完成的问题。
Dredging device for transforming shelter pond
一种用于避风塘改造的疏浚装置
HAO DONG (Autor:in) / DUAN YUNFEI (Autor:in) / TANG DEGUI (Autor:in)
12.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02F
Baggern
,
DREDGING