Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CAP1400 nuclear island heavy shear wall reinforcement cage module construction supporting device and method
The invention discloses a CAP1400 nuclear island heavy shear wall reinforcement cage module construction supporting device and method.The CAP1400 nuclear island heavy shear wall reinforcement cage module construction supporting device comprises lateral stable supports, and the lateral stable supports are arranged on the two sides of a reinforcement cage module; the lateral stabilizing support comprises a steel bar clamp, two plane trusses and a horizontal connecting rod, the horizontal connecting rod is arranged between the two plane trusses, and the steel bar clamp is arranged at the tops of the plane trusses; the plane truss comprises a first vertical rod, a second vertical rod, an inclined vertical rod, a horizontal web member, an inclined web member and fixing bolt mounting holes; the first vertical rod is located on the side close to the reinforcement cage module, and the second vertical rod is located on the side away from the reinforcement cage module. An inclined vertical rod is arranged on the upper portion of the second vertical rod, and a horizontal web member and an inclined web member are arranged among the first vertical rod, the second vertical rod and the inclined vertical rod. The lateral stability of the reinforcement cage module can be improved, the construction risk is reduced, the occupied time of a crane is shortened, and the overall efficiency and economical efficiency of reinforcement cage modular construction are improved.
本发明公开了一种CAP1400核岛重型剪力墙钢筋笼模块施工支撑装置及方法,包括侧向稳定支架,所述侧向稳定支架设置在钢筋笼模块的两侧;所述侧向稳定支架包括钢筋夹具、平面桁架、水平连杆,所述平面桁架设置两个,两个平面桁架之间设置水平连杆,所述平面桁架的顶部设置钢筋夹具;所述平面桁架包括第一立杆、第二立杆、斜立杆、水平腹杆、斜腹杆及固定螺栓安装孔;所述第一立杆位于靠近钢筋笼模块的一侧,所述第二立杆位于远离钢筋笼模块的一侧;所述第二立杆的上部设置斜立杆,所述第一立杆、第二立杆及斜立杆之间设置水平腹杆和斜腹杆。能够增加钢筋笼模块的侧向稳定性,降低施工风险,缩短吊车占用时间,提高钢筋笼模块化施工的整体效率及经济性。
CAP1400 nuclear island heavy shear wall reinforcement cage module construction supporting device and method
The invention discloses a CAP1400 nuclear island heavy shear wall reinforcement cage module construction supporting device and method.The CAP1400 nuclear island heavy shear wall reinforcement cage module construction supporting device comprises lateral stable supports, and the lateral stable supports are arranged on the two sides of a reinforcement cage module; the lateral stabilizing support comprises a steel bar clamp, two plane trusses and a horizontal connecting rod, the horizontal connecting rod is arranged between the two plane trusses, and the steel bar clamp is arranged at the tops of the plane trusses; the plane truss comprises a first vertical rod, a second vertical rod, an inclined vertical rod, a horizontal web member, an inclined web member and fixing bolt mounting holes; the first vertical rod is located on the side close to the reinforcement cage module, and the second vertical rod is located on the side away from the reinforcement cage module. An inclined vertical rod is arranged on the upper portion of the second vertical rod, and a horizontal web member and an inclined web member are arranged among the first vertical rod, the second vertical rod and the inclined vertical rod. The lateral stability of the reinforcement cage module can be improved, the construction risk is reduced, the occupied time of a crane is shortened, and the overall efficiency and economical efficiency of reinforcement cage modular construction are improved.
本发明公开了一种CAP1400核岛重型剪力墙钢筋笼模块施工支撑装置及方法,包括侧向稳定支架,所述侧向稳定支架设置在钢筋笼模块的两侧;所述侧向稳定支架包括钢筋夹具、平面桁架、水平连杆,所述平面桁架设置两个,两个平面桁架之间设置水平连杆,所述平面桁架的顶部设置钢筋夹具;所述平面桁架包括第一立杆、第二立杆、斜立杆、水平腹杆、斜腹杆及固定螺栓安装孔;所述第一立杆位于靠近钢筋笼模块的一侧,所述第二立杆位于远离钢筋笼模块的一侧;所述第二立杆的上部设置斜立杆,所述第一立杆、第二立杆及斜立杆之间设置水平腹杆和斜腹杆。能够增加钢筋笼模块的侧向稳定性,降低施工风险,缩短吊车占用时间,提高钢筋笼模块化施工的整体效率及经济性。
CAP1400 nuclear island heavy shear wall reinforcement cage module construction supporting device and method
一种CAP1400核岛重型剪力墙钢筋笼模块施工支撑装置及方法
REN YU (Autor:in) / CHU MENG (Autor:in) / WANG TAO (Autor:in) / LUO GANG (Autor:in) / CHU YANCHUN (Autor:in) / NI NAN (Autor:in) / YANG YANG (Autor:in) / CHEN YU (Autor:in) / CHANG CHENYU (Autor:in) / CHEN XIAOLUO (Autor:in)
12.12.2023
Patent
Elektronische Ressource
Chinesisch
Concrete module system of integrated reinforcement cage shear wall and construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Fabricated reinforcement cage-cast-in-place concrete shear wall construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|