Construction method of cast-in-place concrete waterproof closing head
The invention relates to a construction method of a cast-in-place concrete waterproof collecting head, and relates to the technical field of building construction, and the construction method comprises the following steps: S1, surveying, paying off and binding wall body steel bars, S2, pretreating a collecting head coiled material, S3, erecting a template, S4, mounting a fixing rod, S5, arranging the collecting head coiled material, S6, completing mold closing, S7, pouring and vibrating a wall body, S8, removing the mold, decorating a wall surface and cleaning a site, and S9, laying the waterproof coiled material. According to the invention, the coiled material of the waterproof material is pre-embedded in the wall body according to the designed height when the wall body is poured, and a steel bar structure and a template structure of the wall body are correspondingly improved, so that the coiled material of the waterproof material is integrally poured with the wall body, the internal fixation of the waterproof material is realized, and the use of steel battens, cement nails and sealants is avoided; erosion caused by factors such as rainwater, vibration, wind blowing and aging is effectively prevented, the problem that a traditional closing joint is prone to opening and falling off is solved, the service life of the waterproof closing joint is prolonged, and the sealing performance and reliability of the waterproof closing joint are improved.
本发明涉及现浇混凝土防水收头的施工方法,涉及建筑施工技术领域,包括:S1:测量放线并捆扎墙体钢筋,S2:收头卷材预处理,S3:支模板,S4:安装固定杆,S5:布置收头卷材,S6:完成合模,S7:墙体浇筑振捣,S8:拆模、墙面装修及场地清理,S9:铺设防水卷材;本发明将收头卷材按照设计高度在墙体浇筑时预埋在其中,并对墙体钢筋结构和模板结构进行了对应的改进,使其与墙体一体化浇筑,实现了防水材料收头的内部固定,避免了钢压条、水泥钉和密封胶的使用,有效防止了雨水、震动、风吹和老化等因素的侵蚀,解决了传统收头节点容易开口和脱落的问题,提高了防水收头节点的寿命、密封性和可靠性。
Construction method of cast-in-place concrete waterproof closing head
The invention relates to a construction method of a cast-in-place concrete waterproof collecting head, and relates to the technical field of building construction, and the construction method comprises the following steps: S1, surveying, paying off and binding wall body steel bars, S2, pretreating a collecting head coiled material, S3, erecting a template, S4, mounting a fixing rod, S5, arranging the collecting head coiled material, S6, completing mold closing, S7, pouring and vibrating a wall body, S8, removing the mold, decorating a wall surface and cleaning a site, and S9, laying the waterproof coiled material. According to the invention, the coiled material of the waterproof material is pre-embedded in the wall body according to the designed height when the wall body is poured, and a steel bar structure and a template structure of the wall body are correspondingly improved, so that the coiled material of the waterproof material is integrally poured with the wall body, the internal fixation of the waterproof material is realized, and the use of steel battens, cement nails and sealants is avoided; erosion caused by factors such as rainwater, vibration, wind blowing and aging is effectively prevented, the problem that a traditional closing joint is prone to opening and falling off is solved, the service life of the waterproof closing joint is prolonged, and the sealing performance and reliability of the waterproof closing joint are improved.
本发明涉及现浇混凝土防水收头的施工方法,涉及建筑施工技术领域,包括:S1:测量放线并捆扎墙体钢筋,S2:收头卷材预处理,S3:支模板,S4:安装固定杆,S5:布置收头卷材,S6:完成合模,S7:墙体浇筑振捣,S8:拆模、墙面装修及场地清理,S9:铺设防水卷材;本发明将收头卷材按照设计高度在墙体浇筑时预埋在其中,并对墙体钢筋结构和模板结构进行了对应的改进,使其与墙体一体化浇筑,实现了防水材料收头的内部固定,避免了钢压条、水泥钉和密封胶的使用,有效防止了雨水、震动、风吹和老化等因素的侵蚀,解决了传统收头节点容易开口和脱落的问题,提高了防水收头节点的寿命、密封性和可靠性。
Construction method of cast-in-place concrete waterproof closing head
现浇混凝土防水收头的施工方法
ZHANG LONG (Autor:in) / WANG JINFENG (Autor:in) / HUANG KANG (Autor:in) / WANG YONGSHUAI (Autor:in) / CHEN XIANGYANG (Autor:in) / XIA HUAWEI (Autor:in)
15.12.2023
Patent
Elektronische Ressource
Chinesisch
Waterproof construction method for pile head of cast-in-place pile
Europäisches Patentamt | 2023
|Waterproof construction method of basement foundation cast-in-place pile head
Europäisches Patentamt | 2015
|Cast-in-place concrete deformation joint waterproof structure and construction method
Europäisches Patentamt | 2023
|Synchronous waterproof and anticorrosive construction method of underground cast-in-place concrete
Europäisches Patentamt | 2020
|