Integrated pile-forming construction method for Yellow pan plain high bearing platform pile
The invention discloses an integrated pile forming construction method for a Yellow pan plain high bearing platform pile. The integrated pile forming construction method comprises the following steps that S1, a construction site is leveled to the designed elevation of the ground and compacted; s2, guard piles are arranged at the fixed pile positions, and the rotary drilling rig is in place; s3, the underground pile casing pipe follows up to conduct rotary excavating, soil taking and hole forming; s4, mounting a ground pile sleeve, and correcting and fixing the sleeve; s5, an operation platform is erected, and holes are cleaned; s6, a reinforcement cage is manufactured and integrally installed; s7, secondary hole cleaning is conducted, a guide pipe is arranged downwards, and an underground pile is poured; s8, the ground piles are poured; and S9, the sleeve is pulled out, and the pile body is maintained. The method is easy to operate, high in pile forming efficiency, high in construction speed, high in pile forming quality, economical, green and environmentally friendly, and has popularization significance.
本发明公开了一种黄泛平原高承台桩一体化成桩施工方法,包括以下步骤:S1、施工场地平整至地面设计标高并压实;S2、定桩位设护桩,旋挖钻机就位;S3、地下桩套管跟进旋挖取土成孔;S4、地上桩套管安装,校正并固定套管;S5、搭设作业平台,清孔;S6、钢筋笼制作与一体化安装;S7、二次清孔,下设导管及灌注地下桩;S8、灌注地上桩;S9、拔出套管,桩身养护。本发明操作简单、成桩效率高、施工速度快、成桩质量高、经济节约、绿色环保,具有推广意义。
Integrated pile-forming construction method for Yellow pan plain high bearing platform pile
The invention discloses an integrated pile forming construction method for a Yellow pan plain high bearing platform pile. The integrated pile forming construction method comprises the following steps that S1, a construction site is leveled to the designed elevation of the ground and compacted; s2, guard piles are arranged at the fixed pile positions, and the rotary drilling rig is in place; s3, the underground pile casing pipe follows up to conduct rotary excavating, soil taking and hole forming; s4, mounting a ground pile sleeve, and correcting and fixing the sleeve; s5, an operation platform is erected, and holes are cleaned; s6, a reinforcement cage is manufactured and integrally installed; s7, secondary hole cleaning is conducted, a guide pipe is arranged downwards, and an underground pile is poured; s8, the ground piles are poured; and S9, the sleeve is pulled out, and the pile body is maintained. The method is easy to operate, high in pile forming efficiency, high in construction speed, high in pile forming quality, economical, green and environmentally friendly, and has popularization significance.
本发明公开了一种黄泛平原高承台桩一体化成桩施工方法,包括以下步骤:S1、施工场地平整至地面设计标高并压实;S2、定桩位设护桩,旋挖钻机就位;S3、地下桩套管跟进旋挖取土成孔;S4、地上桩套管安装,校正并固定套管;S5、搭设作业平台,清孔;S6、钢筋笼制作与一体化安装;S7、二次清孔,下设导管及灌注地下桩;S8、灌注地上桩;S9、拔出套管,桩身养护。本发明操作简单、成桩效率高、施工速度快、成桩质量高、经济节约、绿色环保,具有推广意义。
Integrated pile-forming construction method for Yellow pan plain high bearing platform pile
一种黄泛平原高承台桩一体化成桩施工方法
GAO TIANGANG (Autor:in) / SHENG QIANZHI (Autor:in) / ZHENG WEI (Autor:in) / LIU QING (Autor:in) / PAN FUYONG (Autor:in) / ZHAO YANPENG (Autor:in)
19.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Prefabricated pile length optimization method in yellow pan plain pile foundation construction
Europäisches Patentamt | 2023
|Rapid forming auxiliary device for high bearing platform pile construction
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2021
|Bridge high-pile bearing platform, bridge pile foundation structure and construction method thereof
Europäisches Patentamt | 2020
|Integrated construction method for independent bearing platform and pile foundation
Europäisches Patentamt | 2023
|