Concrete column-beam joint one-time pouring forming construction method
Top fixing rings are correspondingly fixed to the two ends of the beam-column joint through pouring, a lime slurry spraying device is arranged outside the beam-column joint, and the device used in the method comprises two hinged rings which are hinged to each other; the hinge rings are connected to the outer wall of the beam-column joint in a sleeving mode, a telescopic gas spring is connected between the two hinge rings, the two ends of the telescopic gas spring are connected with the hinge rings in a clamped mode, the bottoms of the hinge rings are connected with discharge heads in a penetrating mode, the discharge heads are fixed to the bottoms of the hinge rings through pouring, and the multiple hinge rings are annularly distributed. And one side of each hinge ring is connected with a side connecting pipe in a penetrating mode, one end of each side connecting pipe is connected with an extrusion shell, the extrusion shells are located at the center positions surrounded by the multiple beam-column joints, and the device solves the problem that the practicability is poor at present.
本发明公开了一种混凝土柱梁节点一次浇筑成型施工方法:所述梁柱节点的两端对应通过浇筑固定有顶固定环,所述梁柱节点的外部设置有石灰浆喷射装置,该方法用到的装置包括两个相互铰接的铰接环,所述铰接环套接在梁柱节点的外壁,两个所述铰接环之间连接有伸缩气弹簧,所述伸缩气弹簧的两端与铰接环相互卡接,所述铰接环的底部贯通连接有排出头,所述铰接环的底部通过浇筑固定有排出头,多个所述铰接环呈环形分布,每个所述铰接环的一侧均贯通连接有侧连接管,所述侧连接管的一端连接有挤出壳体,所述挤出壳体位于多个梁柱节点围绕的中心位置,该装置解决了当前实用性差的问题。
Concrete column-beam joint one-time pouring forming construction method
Top fixing rings are correspondingly fixed to the two ends of the beam-column joint through pouring, a lime slurry spraying device is arranged outside the beam-column joint, and the device used in the method comprises two hinged rings which are hinged to each other; the hinge rings are connected to the outer wall of the beam-column joint in a sleeving mode, a telescopic gas spring is connected between the two hinge rings, the two ends of the telescopic gas spring are connected with the hinge rings in a clamped mode, the bottoms of the hinge rings are connected with discharge heads in a penetrating mode, the discharge heads are fixed to the bottoms of the hinge rings through pouring, and the multiple hinge rings are annularly distributed. And one side of each hinge ring is connected with a side connecting pipe in a penetrating mode, one end of each side connecting pipe is connected with an extrusion shell, the extrusion shells are located at the center positions surrounded by the multiple beam-column joints, and the device solves the problem that the practicability is poor at present.
本发明公开了一种混凝土柱梁节点一次浇筑成型施工方法:所述梁柱节点的两端对应通过浇筑固定有顶固定环,所述梁柱节点的外部设置有石灰浆喷射装置,该方法用到的装置包括两个相互铰接的铰接环,所述铰接环套接在梁柱节点的外壁,两个所述铰接环之间连接有伸缩气弹簧,所述伸缩气弹簧的两端与铰接环相互卡接,所述铰接环的底部贯通连接有排出头,所述铰接环的底部通过浇筑固定有排出头,多个所述铰接环呈环形分布,每个所述铰接环的一侧均贯通连接有侧连接管,所述侧连接管的一端连接有挤出壳体,所述挤出壳体位于多个梁柱节点围绕的中心位置,该装置解决了当前实用性差的问题。
Concrete column-beam joint one-time pouring forming construction method
一种混凝土柱梁节点一次浇筑成型施工方法
ZHOU SHIWEI (Autor:in) / LI XINGXIA (Autor:in) / XU ZHENGMAN (Autor:in) / BO YANG (Autor:in) / ZHAO PEI (Autor:in) / SHEN CONG (Autor:in)
19.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Steel reinforced concrete column-beam joint concrete pouring construction method
Europäisches Patentamt | 2021
|Beam column joint concrete separation pouring construction structure and method
Europäisches Patentamt | 2024
|Reinforced concrete beam column pouring construction method
Europäisches Patentamt | 2021
|Beam-column joint concrete plugging device and beam-column joint pouring method
Europäisches Patentamt | 2023
|Wall column beam joint concrete pouring construction method with different strength grades
Europäisches Patentamt | 2022
|