Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Discharging platform for public building construction
The invention discloses a public building construction discharging platform which comprises a base, a first floor, a second floor, a third floor, a fourth floor, a reinforcing assembly and a discharging assembly, the two sides of the base are each fixedly connected with two first fixing parts, and the outer side of the first floor and the outer side of the second floor are each fixedly connected with two second fixing parts. The device has the beneficial effects that through the reinforcing effect of the reinforcing assemblies on the cross beams, the general position of the whole device is aligned, the whole device is stressed in a balanced mode by adjusting the turn buckles, and then installation can be completed; materials are hoisted to the position above the base through the tower crane, unloading can be completed through the discharging assembly, and constructors do not need to go to the base, so that the risks of accidents and injuries are reduced, meanwhile, the efficiency of the unloading process is improved, and the waiting time and the labor cost are reduced.
本发明公开了一种公共建筑施工用卸料平台,包括底座、第一楼板、第二楼板、第三楼板、第四楼板、加固组件和下料组件,底座的两侧均固定连接有两个第一固定件,第一楼板与第二楼板的外侧均固定连接有两个第二固定件,第一固定件与对应的第二固定件之间通过钢丝绳连接,本发明的有益效果是:通过加固组件对横梁的加固作用,将整体装置的大致位置进行对准,通过调节花篮螺栓,使得整体装置受力平衡,即可完成安装,使用时,材料通过塔式起重机吊装到底座的上方,而在卸货时通过下料组件即可完成,施工人员无需上到底座上,因此降低了意外事故和伤害的风险,同时提高卸料过程的效率,减少了等待时间和人力成本。
Discharging platform for public building construction
The invention discloses a public building construction discharging platform which comprises a base, a first floor, a second floor, a third floor, a fourth floor, a reinforcing assembly and a discharging assembly, the two sides of the base are each fixedly connected with two first fixing parts, and the outer side of the first floor and the outer side of the second floor are each fixedly connected with two second fixing parts. The device has the beneficial effects that through the reinforcing effect of the reinforcing assemblies on the cross beams, the general position of the whole device is aligned, the whole device is stressed in a balanced mode by adjusting the turn buckles, and then installation can be completed; materials are hoisted to the position above the base through the tower crane, unloading can be completed through the discharging assembly, and constructors do not need to go to the base, so that the risks of accidents and injuries are reduced, meanwhile, the efficiency of the unloading process is improved, and the waiting time and the labor cost are reduced.
本发明公开了一种公共建筑施工用卸料平台,包括底座、第一楼板、第二楼板、第三楼板、第四楼板、加固组件和下料组件,底座的两侧均固定连接有两个第一固定件,第一楼板与第二楼板的外侧均固定连接有两个第二固定件,第一固定件与对应的第二固定件之间通过钢丝绳连接,本发明的有益效果是:通过加固组件对横梁的加固作用,将整体装置的大致位置进行对准,通过调节花篮螺栓,使得整体装置受力平衡,即可完成安装,使用时,材料通过塔式起重机吊装到底座的上方,而在卸货时通过下料组件即可完成,施工人员无需上到底座上,因此降低了意外事故和伤害的风险,同时提高卸料过程的效率,减少了等待时间和人力成本。
Discharging platform for public building construction
一种公共建筑施工用卸料平台
CHENG GONGJUN (Autor:in) / WANG YUNQIANG (Autor:in) / JIAN JILAI (Autor:in)
19.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste