Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Erosion gully treatment method for gully leveling and farmland building
The invention relates to a gully-leveling farmland-building erosion gully treatment method, and belongs to the technical field of farmland treatment, and the gully-leveling farmland-building erosion gully treatment method comprises the following steps: S1, carrying out slope cutting on slope surfaces at two sides of a gully by using a portable slope cutting device, and building terraced fields on the slope surfaces during slope cutting; s2, economic forests are planted on the terraced field surface; s3, digging drainage ditches in the built terraced field in the direction perpendicular to the ditches; and S4, arranging a plurality of circular impounding reservoirs along the descending direction of the terrace, and ensuring that the circular impounding reservoirs are connected with the drainage ditches. The method has the effect of improving the land utilization rate.
本申请涉及一种平沟造田侵蚀沟治理方法,属于农田治理的技术领域,其包括以下步骤:S1、使用便捷式削坡装置对沟道两侧坡面进行削坡,削坡的同时,将坡面筑成梯田;S2、在梯田田面上种植经济林;S3、在垂直于沟道的方向上在筑成的梯田上挖排水沟道;S4、沿梯田下降方向设置多个圆形蓄水池,并确保其与排水沟相连本申请具有提高土地利用率的效果。
Erosion gully treatment method for gully leveling and farmland building
The invention relates to a gully-leveling farmland-building erosion gully treatment method, and belongs to the technical field of farmland treatment, and the gully-leveling farmland-building erosion gully treatment method comprises the following steps: S1, carrying out slope cutting on slope surfaces at two sides of a gully by using a portable slope cutting device, and building terraced fields on the slope surfaces during slope cutting; s2, economic forests are planted on the terraced field surface; s3, digging drainage ditches in the built terraced field in the direction perpendicular to the ditches; and S4, arranging a plurality of circular impounding reservoirs along the descending direction of the terrace, and ensuring that the circular impounding reservoirs are connected with the drainage ditches. The method has the effect of improving the land utilization rate.
本申请涉及一种平沟造田侵蚀沟治理方法,属于农田治理的技术领域,其包括以下步骤:S1、使用便捷式削坡装置对沟道两侧坡面进行削坡,削坡的同时,将坡面筑成梯田;S2、在梯田田面上种植经济林;S3、在垂直于沟道的方向上在筑成的梯田上挖排水沟道;S4、沿梯田下降方向设置多个圆形蓄水池,并确保其与排水沟相连本申请具有提高土地利用率的效果。
Erosion gully treatment method for gully leveling and farmland building
一种平沟造田侵蚀沟治理方法
22.12.2023
Patent
Elektronische Ressource
Chinesisch