Precast concrete pipe pile and using method thereof
The invention discloses a precast concrete pipe pile and a using method thereof.The precast concrete pipe pile comprises first pipe piles and second pipe piles, a first pipe pile assembly at least comprises two first pipe piles, and lower end plates of the first pipe piles are connected with upper end plates of the first pipe piles through first bolt connecting pieces; the second pipe pile assembly at least comprises a first pipe pile and two second pipe piles, the upper end plate of the first pipe pile is connected with the lower end plate of the second pipe pile through a first bolt connecting piece, and the lower end plate of the first pipe pile is connected with the upper end plate of the second pipe pile through a first bolt connecting piece. And a left end plate and a right end plate are respectively poured in the longitudinal directions of the first pipe pile and the second pipe pile, and the left end plate and the right end plate enable the first pipe pile and the second pipe pile to be in staggered butt joint through a second bolt connecting piece. The continuous pipe pile has the beneficial effects that the first pipe pile and the second pipe pile are in long and short staggered joint butt joint to form a longer continuous pipe pile, so that the area of the connecting part of the whole pipe pile can be increased, the stress and bearing capacity of the connection can be improved, and the connection is firmer and more stable.
本发明公开了一种预制混凝土管桩及其使用方法,包括第一管桩和第二管桩,第一管桩组件至少包括两个第一管桩,第一管桩的下端板通过第一螺栓连接件与第一管桩的上端板相连接,第二管桩组件至少包括一个第一管桩和两个第二管桩,第一管桩的上端板通过第一螺栓连接件与第二管桩的下端板连接,第一管桩的下端板通过第一螺栓连接件与第二管桩的上端板相连接,第一管桩和第二管桩的纵向分别浇筑有左端板和右端板,左端板与右端板通过第二螺栓连接件使第一管桩和第二管桩呈错缝对接。有益效果:将第一管桩和第二管桩进行长短错缝对接,形成一个更长的连续管桩,这样可以增加整个管桩连接部分的面积,提高连接的受力和承载能力,使连接更加牢固和稳定。
Precast concrete pipe pile and using method thereof
The invention discloses a precast concrete pipe pile and a using method thereof.The precast concrete pipe pile comprises first pipe piles and second pipe piles, a first pipe pile assembly at least comprises two first pipe piles, and lower end plates of the first pipe piles are connected with upper end plates of the first pipe piles through first bolt connecting pieces; the second pipe pile assembly at least comprises a first pipe pile and two second pipe piles, the upper end plate of the first pipe pile is connected with the lower end plate of the second pipe pile through a first bolt connecting piece, and the lower end plate of the first pipe pile is connected with the upper end plate of the second pipe pile through a first bolt connecting piece. And a left end plate and a right end plate are respectively poured in the longitudinal directions of the first pipe pile and the second pipe pile, and the left end plate and the right end plate enable the first pipe pile and the second pipe pile to be in staggered butt joint through a second bolt connecting piece. The continuous pipe pile has the beneficial effects that the first pipe pile and the second pipe pile are in long and short staggered joint butt joint to form a longer continuous pipe pile, so that the area of the connecting part of the whole pipe pile can be increased, the stress and bearing capacity of the connection can be improved, and the connection is firmer and more stable.
本发明公开了一种预制混凝土管桩及其使用方法,包括第一管桩和第二管桩,第一管桩组件至少包括两个第一管桩,第一管桩的下端板通过第一螺栓连接件与第一管桩的上端板相连接,第二管桩组件至少包括一个第一管桩和两个第二管桩,第一管桩的上端板通过第一螺栓连接件与第二管桩的下端板连接,第一管桩的下端板通过第一螺栓连接件与第二管桩的上端板相连接,第一管桩和第二管桩的纵向分别浇筑有左端板和右端板,左端板与右端板通过第二螺栓连接件使第一管桩和第二管桩呈错缝对接。有益效果:将第一管桩和第二管桩进行长短错缝对接,形成一个更长的连续管桩,这样可以增加整个管桩连接部分的面积,提高连接的受力和承载能力,使连接更加牢固和稳定。
Precast concrete pipe pile and using method thereof
一种预制混凝土管桩及其使用方法
WANG ZHENGZHEN (Autor:in) / DAI KANGLE (Autor:in) / WANG TIAN (Autor:in) / SU TIANTAO (Autor:in) / ZHAO TIANSHI (Autor:in)
22.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2020
|