Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Blind ditch structure suitable for complex mountain backfill area and construction method of blind ditch structure
The invention discloses a blind ditch structure suitable for a complex mountain backfill area and a construction method thereof.The blind ditch structure comprises a blind ditch mechanism and a backfill area with a drainage unit, the blind ditch mechanism comprises a main blind ditch and a plurality of secondary blind ditches, one end of the main blind ditch is connected with the drainage unit, and the other end of the main blind ditch is connected with the drainage unit; the backfill area is divided into a large backfill area and a small backfill area according to the area, a main blind ditch and a plurality of secondary blind ditches are arranged below a main trunk and a secondary trunk in the large backfill area respectively, the secondary blind ditches are distributed on the two sides of the main blind ditch, the main blind ditch is located below the main trunk, the secondary blind ditches are located below the secondary trunk, and the secondary blind ditches are located below the secondary trunk. And the main trunk road and the secondary trunk road are far away from the building pile foundation. The blind ditch is not arranged near a building pile foundation, large-particle-size block stones and small-particle-size broken stones are adopted for paving and filling, the strength of the whole blind ditch is improved, sedimentation is avoided during construction above the ground, the drainage efficiency is improved, and the maintenance cost is saved.
本发明公开了一种适用于复杂山地回填区盲沟结构及其施工方法,包括盲沟机构和具有排水单元的回填区,所述盲沟机构包括主盲沟和多个次级盲沟,所述主盲沟的一端与所述排水单元相连,所述回填区根据面积分为大回填区和小回填区,在所述大回填区中的主干道和次干道以下分别设置一个主盲沟和多个次级盲沟,所述主盲沟的两侧分布多个所述次级盲沟,所述主盲沟位于主干道以下,多个所述次级盲沟位于次干道以下,所述主干道和所述次干道远离建筑物桩基础。本发明未在建筑物桩基础附近进行设置,采用大粒径块石和小粒径碎石铺筑填充,有利于提高整个盲沟的强度,在地面以上施工时避免发生沉降,提高排水效率,节约维护成本。
Blind ditch structure suitable for complex mountain backfill area and construction method of blind ditch structure
The invention discloses a blind ditch structure suitable for a complex mountain backfill area and a construction method thereof.The blind ditch structure comprises a blind ditch mechanism and a backfill area with a drainage unit, the blind ditch mechanism comprises a main blind ditch and a plurality of secondary blind ditches, one end of the main blind ditch is connected with the drainage unit, and the other end of the main blind ditch is connected with the drainage unit; the backfill area is divided into a large backfill area and a small backfill area according to the area, a main blind ditch and a plurality of secondary blind ditches are arranged below a main trunk and a secondary trunk in the large backfill area respectively, the secondary blind ditches are distributed on the two sides of the main blind ditch, the main blind ditch is located below the main trunk, the secondary blind ditches are located below the secondary trunk, and the secondary blind ditches are located below the secondary trunk. And the main trunk road and the secondary trunk road are far away from the building pile foundation. The blind ditch is not arranged near a building pile foundation, large-particle-size block stones and small-particle-size broken stones are adopted for paving and filling, the strength of the whole blind ditch is improved, sedimentation is avoided during construction above the ground, the drainage efficiency is improved, and the maintenance cost is saved.
本发明公开了一种适用于复杂山地回填区盲沟结构及其施工方法,包括盲沟机构和具有排水单元的回填区,所述盲沟机构包括主盲沟和多个次级盲沟,所述主盲沟的一端与所述排水单元相连,所述回填区根据面积分为大回填区和小回填区,在所述大回填区中的主干道和次干道以下分别设置一个主盲沟和多个次级盲沟,所述主盲沟的两侧分布多个所述次级盲沟,所述主盲沟位于主干道以下,多个所述次级盲沟位于次干道以下,所述主干道和所述次干道远离建筑物桩基础。本发明未在建筑物桩基础附近进行设置,采用大粒径块石和小粒径碎石铺筑填充,有利于提高整个盲沟的强度,在地面以上施工时避免发生沉降,提高排水效率,节约维护成本。
Blind ditch structure suitable for complex mountain backfill area and construction method of blind ditch structure
一种适用于复杂山地回填区盲沟结构及其施工方法
XU HAIJIA (Autor:in) / WANG XINPENG (Autor:in) / TAN GUOHUI (Autor:in) / ZHANG KUI (Autor:in) / FENG WENBO (Autor:in) / HE BIN (Autor:in) / WANG AOLIN (Autor:in) / REN YANZONG (Autor:in) / HE XINSHAN (Autor:in) / CHU DAOGUO (Autor:in)
22.12.2023
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2023
|Pipe ditch excavation and backfill construction method
Europäisches Patentamt | 2020
|