Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Primary pouring method for building secondary structure
The invention discloses a primary pouring method for a housing construction secondary structure, and relates to the technical field of building engineering. Comprising the following steps that 1, a horizontal line is marked through a gradienter, and the periphery of a wall is marked with a pen; secondly, a supporting frame with a certain height is fixed to the foundation, then bottom formworks are laid and fixed to the supporting frame, the bottom faces of all the bottom formworks are located on the same horizontal plane, and the bottom end faces of the bottom formworks are parallel to the horizontal line; the two sides of the reinforcing steel bar are bent through the bending assembly, a worker coats the two sides of the reinforcing steel bar with bar planting glue, at the moment, the reinforcing steel bar descends under driving of the first electric telescopic rod, the worker only needs to align the two sides of the reinforcing steel bar to mounting holes, and after the bending assembly and the clamping mechanism relieve bending and clamping of the reinforcing steel bar, implanting of the reinforcing steel bar is achieved; and the transverse reinforcing steel bars and the longitudinal reinforcing steel bars are sequentially implanted by repeating the steps, and the device can effectively reduce manpower consumption.
本发明公开了一种房建二次结构一次浇筑方法,涉及建筑工程技术领域。包括以下步骤:步骤一、通过水平仪标记水平线,并在墙体四周用笔进行标记;步骤二、在地基上固定一定高度的支撑架,然后在支撑架上铺设并固定底部模板,所有底部模板的底面位于同一水平面,并且底部模板底端面与水平线平行。本发明通过弯曲组件对钢筋的两侧进行弯曲,工人在钢筋的两侧涂覆植筋胶,此时在第一电动伸缩杆的带动下实现钢筋下降,工人只需将钢筋两侧对准安装孔即可,当弯曲组件和夹持机构解除对钢筋的弯曲和夹持后,实现对钢筋的植入,如此反复实现横向的钢筋和纵向的钢筋的依次植入,该装置可以有效的减少人力消耗。
Primary pouring method for building secondary structure
The invention discloses a primary pouring method for a housing construction secondary structure, and relates to the technical field of building engineering. Comprising the following steps that 1, a horizontal line is marked through a gradienter, and the periphery of a wall is marked with a pen; secondly, a supporting frame with a certain height is fixed to the foundation, then bottom formworks are laid and fixed to the supporting frame, the bottom faces of all the bottom formworks are located on the same horizontal plane, and the bottom end faces of the bottom formworks are parallel to the horizontal line; the two sides of the reinforcing steel bar are bent through the bending assembly, a worker coats the two sides of the reinforcing steel bar with bar planting glue, at the moment, the reinforcing steel bar descends under driving of the first electric telescopic rod, the worker only needs to align the two sides of the reinforcing steel bar to mounting holes, and after the bending assembly and the clamping mechanism relieve bending and clamping of the reinforcing steel bar, implanting of the reinforcing steel bar is achieved; and the transverse reinforcing steel bars and the longitudinal reinforcing steel bars are sequentially implanted by repeating the steps, and the device can effectively reduce manpower consumption.
本发明公开了一种房建二次结构一次浇筑方法,涉及建筑工程技术领域。包括以下步骤:步骤一、通过水平仪标记水平线,并在墙体四周用笔进行标记;步骤二、在地基上固定一定高度的支撑架,然后在支撑架上铺设并固定底部模板,所有底部模板的底面位于同一水平面,并且底部模板底端面与水平线平行。本发明通过弯曲组件对钢筋的两侧进行弯曲,工人在钢筋的两侧涂覆植筋胶,此时在第一电动伸缩杆的带动下实现钢筋下降,工人只需将钢筋两侧对准安装孔即可,当弯曲组件和夹持机构解除对钢筋的弯曲和夹持后,实现对钢筋的植入,如此反复实现横向的钢筋和纵向的钢筋的依次植入,该装置可以有效的减少人力消耗。
Primary pouring method for building secondary structure
一种房建二次结构一次浇筑方法
CHEN CHONGGUO (Autor:in) / SU GUANGHONG (Autor:in) / ZHONG JIA (Autor:in) / YANG XUEBO (Autor:in) / ZHANG SHENGZHUO (Autor:in)
22.12.2023
Patent
Elektronische Ressource
Chinesisch
Primary pouring method for building secondary structure
Europäisches Patentamt | 2022
|Secondary structure pouring device and pouring method thereof
Europäisches Patentamt | 2024
|Secondary structure frame column pouring system and pouring method thereof
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|