Method for mounting and dismounting overweight cross beam of cable crane tower frame in steep terrain
The invention discloses a mounting and dismounting method for an overweight cross beam of a cable crane tower frame in steep terrain. The mounting and dismounting method comprises the following steps that S1, a foundation is built; s2, components of the cable crane tower and a cross beam of the cable crane tower are prefabricated; s3, building a tower crane; s4, a cable crane tower frame is built; s5, inclined struts used for fixing the split beams are hoisted; s6, split beams are hoisted to the tops of the stand columns; s7, the tower crane is used for hoisting other sub-beams to the tops of the stand columns, and cross beams of the cable crane tower frame are manufactured; s8, after the cable crane is used, the split beams are hoisted to the flat ground of the slope; and S9, the cable crane tower frame is disassembled, components of the cable crane tower frame are hoisted to the flat ground of the side slope, and then the tower crane is disassembled. The device has the effect of hoisting the cross beam to the cable crane tower under the steep terrain.
本发明公开了一种陡峭地形缆索吊塔架超重横梁安装及拆除方法,其包括以下步骤:步骤S1:搭建基础;步骤S2:预制缆索吊塔架的构件和缆索吊塔架的横梁;步骤S3:搭建塔吊;步骤S4:搭建缆索吊塔架;步骤S5:吊装用于固定分梁的斜撑;步骤S6:向立柱的顶部吊装分梁;步骤S7:利用塔吊向立柱顶部吊装其余分梁,制成缆索吊塔架的横梁;步骤S8:待缆索吊使用完成后,将分梁向斜坡的平地吊装;步骤S9:拆卸缆索吊塔架,将缆索吊塔架的构件向边坡的平地吊装,随后拆卸塔吊。本申请具有在陡峭地形下向缆索吊塔架吊装横梁的效果。
Method for mounting and dismounting overweight cross beam of cable crane tower frame in steep terrain
The invention discloses a mounting and dismounting method for an overweight cross beam of a cable crane tower frame in steep terrain. The mounting and dismounting method comprises the following steps that S1, a foundation is built; s2, components of the cable crane tower and a cross beam of the cable crane tower are prefabricated; s3, building a tower crane; s4, a cable crane tower frame is built; s5, inclined struts used for fixing the split beams are hoisted; s6, split beams are hoisted to the tops of the stand columns; s7, the tower crane is used for hoisting other sub-beams to the tops of the stand columns, and cross beams of the cable crane tower frame are manufactured; s8, after the cable crane is used, the split beams are hoisted to the flat ground of the slope; and S9, the cable crane tower frame is disassembled, components of the cable crane tower frame are hoisted to the flat ground of the side slope, and then the tower crane is disassembled. The device has the effect of hoisting the cross beam to the cable crane tower under the steep terrain.
本发明公开了一种陡峭地形缆索吊塔架超重横梁安装及拆除方法,其包括以下步骤:步骤S1:搭建基础;步骤S2:预制缆索吊塔架的构件和缆索吊塔架的横梁;步骤S3:搭建塔吊;步骤S4:搭建缆索吊塔架;步骤S5:吊装用于固定分梁的斜撑;步骤S6:向立柱的顶部吊装分梁;步骤S7:利用塔吊向立柱顶部吊装其余分梁,制成缆索吊塔架的横梁;步骤S8:待缆索吊使用完成后,将分梁向斜坡的平地吊装;步骤S9:拆卸缆索吊塔架,将缆索吊塔架的构件向边坡的平地吊装,随后拆卸塔吊。本申请具有在陡峭地形下向缆索吊塔架吊装横梁的效果。
Method for mounting and dismounting overweight cross beam of cable crane tower frame in steep terrain
一种陡峭地形缆索吊塔架超重横梁安装及拆除方法
WANG GUIYU (Autor:in) / ZHANG YINGHONG (Autor:in) / WU GUANGMING (Autor:in) / JIANG MEIJUN (Autor:in) / LAN GUOYOU (Autor:in) / GAO JIANBO (Autor:in) / KUANG CHANGSHENG (Autor:in) / MENG QING (Autor:in) / ZHAO WEIXING (Autor:in) / YANG YONG (Autor:in)
26.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Construction process for mounting and dismounting tower crane
Europäisches Patentamt | 2024
|All-steel assembly type tower crane foundation and mounting and dismounting method thereof
Europäisches Patentamt | 2024
|Tower crane system and dismounting method of attachment rod of tower crane system
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2023
|Tower crane foundation, tower crane and mounting method of tower crane
Europäisches Patentamt | 2024
|